A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Chiba, J.C.

Paper Title Page
FPAT071 Timing System for J-PARC 3853
 
  • F. Tamura
    JAERI/LINAC, Ibaraki-ken
  • J.C. Chiba, T. Katoh, M. Yoshii
    KEK, Ibaraki
 
  J-PARC has three accelerators running at the different repetition rates; a 400-MeV linac (50Hz), a 3-GeV rapid cycling synchrotron (RCS, 25Hz), and a 50-GeV synchrotron (MR). The linac and the RCS deliver the beam pluses to the different destinations in each cycle. The destinations are scheduled according to the machine operations. We define two kinds of timing, "scheduled timing" and "synchronization timing" so that the accelerators are operated with proper timing and the beam pulses are transported to the experimental facilities or the next accelerators. The J-PARC complex requires a stable and precise timing system. The system is based on a master clock generated by a synthesizer and the triggers are operated independently of the AC-line frequency. We describe the design of the J-PARC timing system and their configuration, and also present the hardware details.