TPAP010 Reliability Analysis of the LHC Beam Dumping System 1201
 
  • R. Filippini, E. Carlier, L. Ducimetière, B. Goddard, J.A. Uythoven
    CERN, Geneva
 
  The design of the LHC Beam Dumping System is aimed at ensuring a safe beam extraction and deposition under all circumstances. The system adopts redundancy and continuous surveillance for most of its parts. Extensive diagnostics after each beam dumping action will be performed to reduce the risk of a faulty operation at the subsequent dump trigger. Calculations of the system’s safety and availability are presented, considering the detailed design of the trigger generation system and the power converters of the beam dumping kickers and septa magnets.  
RPPE041 Design and Construction of the CERN LEIR Injection Septa 2690
 
  • J. Borburgh, B. Balhan, P. Bobbio, E. Carlier, M. Hourican, T. Masson, T.N. Mueller, A. Prost
    CERN, Geneva
  • M. Crescenti
    TERA, Novara
 
  The Low Energy Ion Ring (LEIR) transforms long pulses from Linac 3 into high brilliance ion bunches for LHC by means of multi-turn injection, electron cooling and accumulation. The LEIR injection comprises a magnetic DC septum followed by an inclined electrostatic septum. The electrostatic septum has been newly designed and built. The magnetic septum is mainly recovered from the former LEAR machine, but required a new vacuum chamber. Dynamic vacua in the 10-12 mbar range are required, which are hard to achieve due to the high desorption rate of ions lost on the surface. A new interlock and displacement control system has also been developed. The major technical challenges to meet the magnetic, electrical and vacuum requirements will be discussed.