Paper | Title | Page |
---|---|---|
TPPT067 | High Power Coupler Studies for the ERLP | 3736 |
|
||
Funding: ASTeC, CCLRC Daresbury Laboratory. Two Superconducting RF modules of the ELBE type have been ordered from Accel Instruments GmbH for use on the Energy Recovery Linac Prototype (ERLP) being built at Daresbury Laboratory. One structure is to be used as a booster module, with an energy gain of 8 MeV, and the other is to act as an energy recovery linac operating at electron beam energy of up to 35 MeV. High power couplers capable of handling up to 10 kW CW are required to provide successful operation of the ERLP. Once received from Accel four couplers including RF windows will be conditioned and tested at FZR Dresden; this paper describes the test procedure anticipated. |
||
RPPP036 | A Test Facility for the International Linear Collider at SLAC End Station A for Prototypes of Beam Delivery and IR Components | 2461 |
|
||
Funding: U.S. Department of Energy. The SLAC Linac can deliver damped bunches with ILC parameters for bunch charge and bunch length to End Station A (ESA). A 10Hz beam at 28.5 GeV energy can be delivered to ESA, parasitic with PEP-II operation. During the engineering design phase for the ILC over the next 5 years, we plan to use this facility to prototype and test key components of the Beam Delivery System (BDS) and Interaction Region (IR). We discuss our plans for this ILC Test Facility and preparations for carrying out experiments related to Collimator Wakefields, Materials Damage Tests and Energy Spectrometers. We also plan an IR Mockup of the region within 5 meters of the ILC Interaction Point to investigate effects from backgrounds and beam rf higher-order modes (HOMs). |