Assadi, S.

Paper Title Page
WPAE041 Development of a New Beam Diagnostics Platform 2669
 
  • R.T. Roseberry, S. Assadi, G.R. Murdoch
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

The Spallation Neutron Source Project (SNS) is an accelerator-based neutron source currently under construction at Oak Ridge National Laboratory (ORNL). The availability of space along completed portions of the accelerator for the addition of beam diagnostic is limited. A new platform for mounting a variety of instruments has been created by replacing part of the Medium Energy Beam Transport (MEBT) section of the accelerator developed by Lawrence Berkeley National Laboratory. The design and current capabilities of this instrument platform will be presented along with plans for future enhancements.

 
WPAT085 4.2 K Operation of the SNS Cryomodules 4173
 
  • I.E. Campisi, S. Assadi, F. Casagrande, M. Champion, C. Chu, S.M. Cousineau, M.T. Crofford, C. Deibele, J. Galambos, P.A. Gurd, D.R. Hatfield, M.P. Howell, D.-O. Jeon, Y.W. Kang, K.-U. Kasemir, Z. Kursun, H. Ma, M.F. Piller, D. Stout, W.H. Strong, A.V. Vassioutchenko, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos and Oak Ridge.

The Spallation Neutron Source being built at the Oak Ridge National Laboratory employs eighty one 805 MHz superconducting cavities operated at 2.1 K for the H- beam to gain energy in the main linac from 187 MeV to about 1 GeV. The superconducting cavities and cryomodules with two different values of beta .61 and .81 have been designed and constructed at Jefferson Lab for operation at 2.1 K with unloaded Q’s in excess of 5x109. To gain experience in testing cryomodules in the SNS tunnel before the final commissioning of the 2.1 K Central Helium Liquefier, integration tests were conducted on a medium beta (.61) cryomodule at 4.2 K. This is the first time that a superconducting cavity system specifically designed for 2.1 K operation has been extensively tested at 4.2 K without superfluid helium. Even at 4.2 K it was possible to test all of the functional properties of the cryomodule and of the cavities. In particular, at a nominal BCS Qo˜7x108, simultaneous pulse operation of all three cavities in the cryomodule was achieved at accelerating gradients in excess of 12 MV/m. These conditions were maintained for several hours at a repetition rate of 30 pps. Details of the tests will be presented and discussed.

 
RPAT039 Feasibility Study of Using an Electron Beam for Profile Measurements in the SNS Accumulator Ring 2586
 
  • A.V. Aleksandrov, S. Assadi, S.M. Cousineau, V.V. Danilov, S. Henderson, M.A. Plum
    ORNL, Oak Ridge, Tennessee
  • P.V. Logatchev, A.A. Starostenko
    BINP SB RAS, Novosibirsk
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.

The design goal for the SNS ring is to accumulate 2·1014 protons per 1ms pulse at a 60Hz repetition rate. Achieving the design beam intensity with acceptable losses is a challenging task, which could be tackled more easily if reliable measurements of the beam profile in the ring are available. The high power density of the beam precludes the use of conventional wire scanners or harps and therefore non-interceptive types of profiles measurements are required. The electron beam probe method was suggested for measuring profiles in high power beams. In this method, deflection of a low energy electron beam by the collective field of the high intensity beam is measured. The charge density in the high intensity beam can be restored under certain conditions or estimated by various mathematical techniques. We studied the feasibility of using the electron beam probe for the SNS accumulator ring using computer simulations of the diagnostic setup. A realistic electron gun model and realistic proton beam distributions were used in the simulations. Several profile calculation techniques were explored and the results are reported in this paper.