HOME
PAC2001 Keywords PAC2001 Logo
A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Keyword: commissioning

Paper Title Other Keywords Page
MOAL001 RHIC Commissioning and First Results (Invited) polarized beams, storage-ring, superconducting magnet 1
  Watch the Streaming Video  
 
  • S. Ozaki (BNL)
 
MOPA001 Luminosity Upgrades for the Tevatron Collider (Invited) collider  
  * contribution not received
 
  • S. Mishra (FNAL)
 
TOPB001 How to Commission, Operate and Maintain a Large Future Accelerator Complex from Far Remote Sites (Invited) accelerator, controls 259
 
  • F. Willeke (DESY) , S. Peggs (BNL) , S. Myers (CERN) , D. Hartill (Cornell University) , P. Czarapata (FNAL) , C. Zhang (Institute of High Energy Physics, Beijing) , M. Serio (Istituto Nazionale di Fisica Nucleare) , N. Toge (KEK) , N. Phinney (SLAC)
 
WPAH050 Vacuum System for the LNLS 500-MeV Booster Synchrotron booster, vacuum 2201
 
  • M.J. Ferreira, R.O. Ferraz, F.R. Francisco, M.B. Silva (National Synchrotron Light Laboratory [LNLS])
 
WPPH094 Commissioning Results of ANKA lifetime, operational-performance, storage-ring 2683
 
  • D. Einfeld, E. Huttel, G.K. Sahoo (FGS, Forschungszentrum Karlsruhe) , F. Pérez, M. Pont (ANKA GmbH)
 
ROPA001 Completion and Operation of ISAC-I and Extension to ISAC-II (Invited) accelerator, drift tube linac (DTL), radioactive beams, superconducting-rf 556
 
  • R.E. Laxdal (TRIUMF)
 
FPAH112 Beam Commissioning and First Operation of the ISAC DTL at TRIUMF accelerator, heavy-ion, linac 3942
 
  • R.E. Laxdal, G. Dutto, K. Fong, G.H. Mackenzie, M. Pasini, R.L. Poirier, R. Ruegg (TRIUMF)
 

HOME