Author: Scarpine, V.E.
Paper Title Page
TUPOA29 Beam Position Monitoring System for the PIP-II Injector Test Accelerator 349
 
  • N. Patel, C.I. Briegel, J.S. Diamond, N. Eddy, B.J. Fellenz, J. Fitzgerald, V.E. Scarpine
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359.
The Proton Improvement Plan II (PIP-II) injector test accelerator is an integrated systems test for the front-end of a proposed continuous-wave (CW) compatible, pulsed H superconducting RF linac. This linac is part of Fermilab's PIP-II upgrade. This injector test accelerator will help minimize the technical risk elements for PIP-II and validate the concept of the front-end. Major goals of the injector accelerator are to test a CW RFQ and H source, a bunch-by-bunch Medium-Energy Beam Transport (MEBT) beam chopper and stable beam acceleration through low-energy superconducting cavities. Operation and characterization of this injector places stringent demands on the types and performance of the accelerator beam diagnostics. A beam position monitor (BPM) system has been developed for this application and early commissioning measurements have been taken of beam transport through the beamline.
 
poster icon Poster TUPOA29 [0.469 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-TUPOA29  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOB64 Beam Measurements at the PIP-II Injector Test LEBT 636
 
  • J.-P. Carneiro, B.M. Hanna, L.R. Prost, V.E. Scarpine, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
 
  This paper presents the main results obtained during a series of beam measurements performed on the PIP-II Injector Test LEBT from November 2014 to June 2015. The measurements which focus on beam transmission, beam size and emittance at various locations along the beamline are compared with the beam dynamics code TRACK. These studies were aimed at preparing the beam for optimal operation of the RFQ, while evaluating simulation tools with respect to experimental data.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-TUPOB64  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOA15 Installation Progress at the PIP-II Injector Test at Fermilab 722
 
  • C.M. Baffes, M.L. Alvarez, R. Andrews, A.Z. Chen, J. Czajkowski, P. Derwent, J.P. Edelen, B.M. Hanna, B.D. Hartsell, K.R. Kendziora, D.V. Mitchell, L.R. Prost, V.E. Scarpine, A.V. Shemyakin, J. Steimel, T.J. Zuchnik
    Fermilab, Batavia, Illinois, USA
  • A.L. Edelen
    CSU, Fort Collins, Colorado, USA
 
  Funding: Fermilab is operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy
A CW-compatible, pulsed H superconducting linac 'PIP-II' is being planned to upgrade Fermilab's injection complex. To validate the concept of the front-end of such a machine, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC 30 keV H ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-WEPOA15  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)