Paper | Title | Page |
---|---|---|
THPOA18 | Simulating Batch-on-Batch Slip-Stacking in the Fermilab Recycler Using a New Multiple Interacting Bunch Capability in Synergia | 1135 |
|
||
Funding: U.S. Department of Energy, contract DE-AC02-07CH11359 The Recycler is an 8 GeV/c proton storage ring at Fermilab. To achieve the 700 MW beam power goals for the NOvA neutrino oscillation experiment, the Recycler accumulates 12 batches of 80-bunch trains from the Booster using slip-stacking. One set of bunch trains are injected into the ring and decelerated, then a second set is injected at the nominal momentum. The trains slip past each other longitudinally due to their momenta difference. We have recently extended the multi-bunch portion of the Synergia beam simulation program to allow co-propagation of bunch trains at different momenta. In doing so, we have expanded the applicability of the massively parallel multi-bunch physics portion of Synergia to include new categories of bunch-bunch interactions. We present results from our first application of these capabilities to batch-on-batch slip stacking in the Recycler. |
||
![]() |
Poster THPOA18 [2.144 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-THPOA18 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |