Paper | Title | Page |
---|---|---|
WEB3IO01 | SRF Devlopment and Cryomodule Production for the FRIB Linac | 847 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Sci-ence under Cooperative Agreement DE-SC0000661 The Facility for Rare Isotope Beams' heavy ion con-tinuous-wave (CW) linac extends superconducting RF to low beam energy of 500 keV/u. 332 low-beta cavities are housed in 48 cryomodules. Technical development of high performance subsystems including resonator, cou-pler, tuner, mechanical damper, solenoid and magnetic shielding is necessary. In 2015, the first innovatively designed FRIB bottom-up prototype cryomodule was tested meeting all FRIB specifications. In 2016, the first full production cryomodule is constructed and tested. The preproduction and production cryomodule procurements and in-house assembly are progressing according to the project plan. |
||
![]() |
Slides WEB3IO01 [15.765 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-WEB3IO01 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |