Paper | Title | Page |
---|---|---|
TUPOA29 | Beam Position Monitoring System for the PIP-II Injector Test Accelerator | 349 |
|
||
Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359. The Proton Improvement Plan II (PIP-II) injector test accelerator is an integrated systems test for the front-end of a proposed continuous-wave (CW) compatible, pulsed H− superconducting RF linac. This linac is part of Fermilab's PIP-II upgrade. This injector test accelerator will help minimize the technical risk elements for PIP-II and validate the concept of the front-end. Major goals of the injector accelerator are to test a CW RFQ and H− source, a bunch-by-bunch Medium-Energy Beam Transport (MEBT) beam chopper and stable beam acceleration through low-energy superconducting cavities. Operation and characterization of this injector places stringent demands on the types and performance of the accelerator beam diagnostics. A beam position monitor (BPM) system has been developed for this application and early commissioning measurements have been taken of beam transport through the beamline. |
||
![]() |
Poster TUPOA29 [0.469 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-TUPOA29 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |