Author: Mountford, B.
Paper Title Page
THPH35
The Bright Beamlines - Beamline Build Program of the Australian Synchrotron  
 
  • B. Mountford, A. Walsh
    ASCo, Clayton, Victoria, Australia
  • H. Cherukuvada
    AS - ANSTO, Clayton, Australia
 
  The Australian Synchrotron is entering its first major beamline build program since the completion of its original beamline construction phase which accompanied the construction of the facility. The Bright Program aims to construct 8 Beamlines by 2024 with 2 beamlines having accompanying branchlines and supporting endstations. Conceptual designs of the first two beamlines are underway and are aimed at providing medium energy XAFS (MCT) and micro-computed tomographic imaging capability (MCT), both off bend magnet sources. Planning is well advanced for the following two beamlines with the start of conceptual engineering work expected to start in the second half of 2018. This poster will describe the scope of the Bright Beamline Program and the anticipated beamline engineering challenges that are already identified. The impact on existing technical systems and infrastructure will also be described.  
poster icon Poster THPH35 [1.563 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)