Paper | Title | Page |
---|---|---|
TUPH20 |
R&Ds of the Beamline and the Related Facilities at the Photon Factory. | |
|
||
The Photon Factory in the KEK has been operating two SR sources, the PF-ring and the PF-AR for over thirty years. Although even now the 2 rings are used extensively in the wide science fields, the aging problems are quite critical so that we started considering the upgrades of the rings and a new SR facility. Assuming an extremely low-emittance storage ring, we are studying in 5 items, beamline optics design, vibration reduction, heat-load management, beam control and beamline vacuum. In particular, the vibration reduction and heat-load management are quite important issues and we are antecedently conducting necessary R&Ds of the beamline and the related facilities, first mirror heat-load management with test chamber, vibration evaluation with fine encoder, development of the phase separator for stable nitrogen supply and the development of the GRIDCOP direct-cooling mirror system. Here, we will introduce our R&Ds. | ||
![]() |
Poster TUPH20 [4.766 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |