Author: Connatser, R.W.
Paper Title Page
TUPH10 Interfaces with Operational Systems APS Upgrade Project Removal and Installation 43
 
  • R.W. Connatser
    ANL, Argonne, Illinois, USA
 
  Funding: Created by UChicago Argonne, LLC, Operator of Argonne National Laboratory. Argonne, a U.S. Department of Energy Office of Science laboratory, is operated under Contract No. DE-AC02-06CH11357.
A critical time for the APS Upgrade Project is the twelve month dark period in which the current accelerator, front ends, and insertion devices will be removed and the new MBA will be installed. In addition to the technical interfaces, there are a significant number of operational support systems and utilities that will be affected. For the dark period to be a success, these additional interfaces need to be described and their interaction with the removal and installation processes defined. This poster describes many of these additional systems and their interfaces.
 
poster icon Poster TUPH10 [0.354 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-MEDSI2018-TUPH10  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)