Paper |
Title |
Page |
WEPH18 |
Operation Status of HLS System Installed to Measure Ground Change of Large Scientific Equipment in Real Time |
245 |
|
- H. J. Choi, J.H. Han, H.-S. Kang, S.H. Kim, S.N. Kim, H.-G. Lee, S.B. Lee
PAL, Pohang, Kyungbuk, Republic of Korea
|
|
|
Several parts that comprise the large scientific equipment should be installed and operated at precise three-dimensional location coordinates X, Y, and Z through survey and alignment to ensure their optimal performance. As time goes by, however, the ground goes through uplift and subsidence, which consequently changes the coordinates of installed components and leads to alignment errors. As a result, the system parameters change, and the performance of the large scientific equipment deteriorates accordingly. Measuring the change in locations of systems comprising the large scientific equipment in real time would make it possible to predict alignment errors, locate any region with greater changes, realign components in the region fast, and shorten the time of survey and alignment. For this purpose, a WPS's (wire position sensor) are installed in undulator section and a HLS's (hydrostatic leveling sensor) are installed in PAL-XFEL building. This paper is designed to introduce performance enhancements to reduce observed phenomena and measurement errors in the HLS system operation process.
|
|
|
Poster WEPH18 [2.958 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-MEDSI2018-WEPH18
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|