Author: Sun, S.
Paper Title Page
MOPE31 Dynamic Performance of a Support System for BBA Components in SXFEL 80
 
  • F. Gao, R.B. Deng, Y.X. Dong, X. Hu, Z. Jiang, S. Sun, L. Wang, Y.M. Wen
    SINAP, Shanghai, People’s Republic of China
 
  The electron beam orbit stability is very important for the Free Electron Laser (FEL) facility. The high beam position stability requirement results in the high position stability for the FEL key components, such as quadruple magnet (Q) and beam position monitor (BPM). This work focus on the research of the dynamic performance of a mechanical support system composed of mechanical supports - including sheets and adjustments - and a granite block mounted on them. It will be applied for the beam based alignment (BBA) Q magnet and BPM for the Soft X-ray FEL project (SXFEL). The Finite-element -FE- calculations of the model characteristics were carried out to guide the subsequent tests. The test results show that the support system can meet the requirement of the SXFEL project.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-MEDSI2016-MOPE31  
About • paper received ※ 09 September 2016       paper accepted ※ 14 September 2016       issue date ※ 22 June 2017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPE38 Progress and Mechanical Engineering of FEL Projects at SINAP 246
 
  • L. Yin, W. Fang, X. Hu, S. Sun, L. Wang, L.Y. Yu, W. Zhang
    SINAP, Shanghai, People’s Republic of China
 
  Free electron laser (FEL) technology is the next focus at Shanghai Institute of Applied Physics (SINAP). Shanghai Deep Ultraviolet Free-Electron Laser (SDUV-FEL), a test facility for new FEL principles, was operated for 5 years and got a series of important results. Dalian Coherent Light Source (DCLS), a 50~150nm wavelength FEL user facility based on a 300MeV linac located at Dalian Institute of Chemical Physics, started beam commissioning in August. Shanghai X-ray Free-Electron Laser (SXFEL), a soft X-ray FEL test facility based on an 840MeV linac, will be installed in this month and the commissioning is scheduled at the beginning of 2017. The Progress of the FEL projects and the mechanical engineering in the design and construction are presented.  
poster icon Poster TUPE38 [8.096 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-MEDSI2016-TUPE38  
About • paper received ※ 07 September 2016       paper accepted ※ 15 September 2016       issue date ※ 22 June 2017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)