Paper | Title | Page |
---|---|---|
THPO053 | Status of the China Material Irradiation Facility RFQ | 811 |
|
||
Funding: Supported by the National Magnetic Confinement Fusion Science Program of China (Grant No.2014GB104001) and the National Natural Science Foundation of China (Grant No.91426303). The pulsed high power test and beam test of the China Material Irradiation Facility RFQ have been implemented. Before this, the radio frequency measurements and tuning are performed. In this paper, the processes and results of the radio frequency measurements, tuning, pulsed high power test and beam test will be presented. The results of tests are in good agreement with the design. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO053 | |
About • | paper received ※ 12 September 2018 paper accepted ※ 21 September 2018 issue date ※ 18 January 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |