Author: Zhang, B.
Paper Title Page
MOPO087 Cold Test of Hybrid RFQ Prototype 184
SPWR012   use link to see paper's listing under its alternate paper code  
 
  • P.Y. Yu, Y. He, C.X. Li, F.F. Wang, Z.J. Wang, B. Zhang
    IMP/CAS, Lanzhou, People’s Republic of China
 
  Hybrid RFQ is proposed as a potential good choice at the low-energy range of linear accelerator, which is combined by four-vane RFQ structure and CH-DTL structure. It has higher energy gain rate compared to conventional RFQ, and it is more compact than traditional DTL. In order to research on process exploration and RF parameters of this structure, an aluminium prototype is developed. The cold test of Hybrid RFQ prototype is completed. This paper will present the results and analysis of the test.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO087  
About • paper received ※ 12 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPO120 Improvement of the Linear Part in the Tuner System of ADS 25 MeV Linac 250
 
  • L. Zhang, Z. Gao, L.B. Liu, F.F. Wang, B. Zhang
    IMP/CAS, Lanzhou, People’s Republic of China
 
  Tuner system is the indispensable part of ADS high current proton superconducting linac. It influences the working frequency of superconducting cavity of particle accelerator. To completely understand the working situa-tion of the tuner system and analyses the problems existing in it, experiments of linear part were fully conducted.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO120  
About • paper received ※ 09 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO053 Status of the China Material Irradiation Facility RFQ 811
 
  • C.X. Li, W.L. Chen, W.P. Dou, Z. Gao, Y. He, G. Huang, C.L. Li, L. Lu, W. Ma, A. Shi, L.B. Shi, L.P. Sun, F.F. Wang, W.B. Wang, Z.J. Wang, Q. Wu, X.B. Xu, L. Yang, P.Y. Yu, B. Zhang, J.H. Zhang, P. Zhang, T.M. Zhu
    IMP/CAS, Lanzhou, People’s Republic of China
 
  Funding: Supported by the National Magnetic Confinement Fusion Science Program of China (Grant No.2014GB104001) and the National Natural Science Foundation of China (Grant No.91426303).
The pulsed high power test and beam test of the China Material Irradiation Facility RFQ have been implemented. Before this, the radio frequency measurements and tuning are performed. In this paper, the processes and results of the radio frequency measurements, tuning, pulsed high power test and beam test will be presented. The results of tests are in good agreement with the design.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO053  
About • paper received ※ 12 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)