Paper |
Title |
Page |
TUPO003 |
Development of CW Heavy Ion Linac at IMP |
326 |
TUOP08 |
|
|
- X. Yin, H. Du, Y. He, Q.Y. Kong, X.N. Li, Z.S. Li, L.Z. Ma, J. Meng, C. Qian, L.T. Sun, K.D. Wang, J.X. Wu, J.W. Xia, W.J. Xie, Z. Xu, Y.Q. Yang, Q.G. Yao, Y.J. Yuan, W. Zhang, X.Z. Zhang, Y. Zhang, H.W. Zhao, Z.Z. Zhou
IMP/CAS, Lanzhou, People’s Republic of China
- J.E. Chen, S.L. Gao, G. Liu, Y.R. Lu, Z. Wang, X.Q. Yan, K. Zhu
PKU, Beijing, People’s Republic of China
|
|
|
A new heavy ion linac as the injector for the Separated Sector Cyclotron (SSC), named SSC-Linac[1], is being under constructed at the national laboratory Heavy Ion Research Facility in Lanzhou (HIRFL). The SSC-Linac mainly consists of a 4-rod RFQ and three IH-DTL cavities which can accelerate ion of A⁄q≤7from 3.73 keV/u to 1.025 MeV/u. Both of themoperating at 53.667MHz had been developed. In the commissioning, ions weresuccessfully accelerated to 0.295MeV/u by IH-DTL1. The beam commissioningof the IH-DTL2 which can accelerate the ion to 0.586MeV/u will come soon. In this paper, the recent R&D progress of the SSC-Linac including the development of key components and the beam commissioning results arepresented.
|
|
|
Slides TUPO003 [7.335 MB]
|
|
|
Poster TUPO003 [0.810 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO003
|
|
About • |
paper received ※ 12 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPO054 |
Recent Progress of a CW 4-rod RFQ for the SSC-LINAC |
814 |
|
- Z.S. Li, Y. Cong, H. Du, Y. He, L. Jing, Q.Y. Kong, X.N. Li, J. Meng, G.D. Shen, K.D. Wang, Z.J. Wang, W. Wei, J.X. Wu, J.W. Xia, H.M. Xie, W.J. Xie, Z. Xu, J.C. Yang, Y.Q. Yang, X. Yin, Y.J. Yuan, Y. Zhang
IMP/CAS, Lanzhou, People’s Republic of China
- Y.R. Lu
PKU, Beijing, People’s Republic of China
|
|
|
The SSC-LINAC is under design and construction as a linear injector for the Separated-Sector Cyclotron (SSC) of the Heavy Ion Research Facility at Lanzhou (HIRFL). The continuous-wave (CW) 4-rod radio-frequency quad-rupole (RFQ) of the SSC-LINAC has important progress in past years. In the autumn of 2016, the cavity has been operated with 35 kW on CW mode in automatic RF con-trolled mode during RF power commissioning, which is needed to accelerate 238U34+ beams. The beam transmis-sion efficiency, transverse emittance and energy spread has been obtained in beam commissioning. In this paper, the results of experiments will be presented and discussed in detail.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-THPO054
|
|
About • |
paper received ※ 12 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|