TUPO005 |
Initial Beam Commissioning of LEAF at IMP |
332 |
|
- Y. Yang, W.P. Dou, X. Fang, Y.H. Guo, H. Jia, L. Jing, X.J. Liu, L. Lu, W. Lu, W. Ma, L.T. Sun, L.P. Sun, W. Wei, H.W. Zhao, Y.H. Zhai
IMP/CAS, Lanzhou, People’s Republic of China
|
|
|
A Low Energy intense-highly-charged ion Accelerator Facility (LEAF), which mainly includes an ECR ion source, LEBT and an 81.25 MHz RFQ, was designed to produce and accelerate heavy ions, from helium to uranium with A/Q between 2 and 7, to the energy of 0.5 MeV/u. The typical beam intensity is designed up to 2 emA CW for the uranium beam. The facility has been successfully commissioned with He+ (A/Q=4) and N2+ (A/Q=7) beams and accelerated the beams in the CW regime to the designed energy of 0.5 MeV/u. Beam properties and transmission efficiencies were measured, indicating a good consistency with simulated data. After having briefly recalled the project scope and parameters, this paper describes the beam commissioning strategy and detailed commissioning results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO005
|
|
About • |
paper received ※ 11 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPO054 |
Recent Progress of a CW 4-rod RFQ for the SSC-LINAC |
814 |
|
- Z.S. Li, Y. Cong, H. Du, Y. He, L. Jing, Q.Y. Kong, X.N. Li, J. Meng, G.D. Shen, K.D. Wang, Z.J. Wang, W. Wei, J.X. Wu, J.W. Xia, H.M. Xie, W.J. Xie, Z. Xu, J.C. Yang, Y.Q. Yang, X. Yin, Y.J. Yuan, Y. Zhang
IMP/CAS, Lanzhou, People’s Republic of China
- Y.R. Lu
PKU, Beijing, People’s Republic of China
|
|
|
The SSC-LINAC is under design and construction as a linear injector for the Separated-Sector Cyclotron (SSC) of the Heavy Ion Research Facility at Lanzhou (HIRFL). The continuous-wave (CW) 4-rod radio-frequency quad-rupole (RFQ) of the SSC-LINAC has important progress in past years. In the autumn of 2016, the cavity has been operated with 35 kW on CW mode in automatic RF con-trolled mode during RF power commissioning, which is needed to accelerate 238U34+ beams. The beam transmis-sion efficiency, transverse emittance and energy spread has been obtained in beam commissioning. In this paper, the results of experiments will be presented and discussed in detail.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-THPO054
|
|
About • |
paper received ※ 12 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|