Author: Wang, Z.J.
Paper Title Page
MOPO087 Cold Test of Hybrid RFQ Prototype 184
SPWR012   use link to see paper's listing under its alternate paper code  
 
  • P.Y. Yu, Y. He, C.X. Li, F.F. Wang, Z.J. Wang, B. Zhang
    IMP/CAS, Lanzhou, People’s Republic of China
 
  Hybrid RFQ is proposed as a potential good choice at the low-energy range of linear accelerator, which is combined by four-vane RFQ structure and CH-DTL structure. It has higher energy gain rate compared to conventional RFQ, and it is more compact than traditional DTL. In order to research on process exploration and RF parameters of this structure, an aluminium prototype is developed. The cold test of Hybrid RFQ prototype is completed. This paper will present the results and analysis of the test.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO087  
About • paper received ※ 12 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPO106 Mathematical Principle and Numerical Reconstruction in Real Space Measurement with a Rotating BPM 560
 
  • P. Jiang, Y. He, Z.J. Wang
    IMP/CAS, Lanzhou, People’s Republic of China
 
  It is difficult to measure beam profiles and monitor the beam during beam supply for high intensity high power accelerators. Based on the button pick-ups, the mathematical principle of a rotating BPM is proposed. SVD method is used to reconstruct the beam in x-y real space, and the basic parameters used in beam reconstruction are argued. The beam distribution in x-y real space is reconstructed well and compared to the reference beam. The beam reconstruction is sensitive to the electrode radius. The meshing and the grid numbers in the solution window have an import effect on the beam reconstruction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO106  
About • paper received ※ 12 September 2018       paper accepted ※ 19 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO053 Status of the China Material Irradiation Facility RFQ 811
 
  • C.X. Li, W.L. Chen, W.P. Dou, Z. Gao, Y. He, G. Huang, C.L. Li, L. Lu, W. Ma, A. Shi, L.B. Shi, L.P. Sun, F.F. Wang, W.B. Wang, Z.J. Wang, Q. Wu, X.B. Xu, L. Yang, P.Y. Yu, B. Zhang, J.H. Zhang, P. Zhang, T.M. Zhu
    IMP/CAS, Lanzhou, People’s Republic of China
 
  Funding: Supported by the National Magnetic Confinement Fusion Science Program of China (Grant No.2014GB104001) and the National Natural Science Foundation of China (Grant No.91426303).
The pulsed high power test and beam test of the China Material Irradiation Facility RFQ have been implemented. Before this, the radio frequency measurements and tuning are performed. In this paper, the processes and results of the radio frequency measurements, tuning, pulsed high power test and beam test will be presented. The results of tests are in good agreement with the design.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO053  
About • paper received ※ 12 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO054 Recent Progress of a CW 4-rod RFQ for the SSC-LINAC 814
 
  • Z.S. Li, Y. Cong, H. Du, Y. He, L. Jing, Q.Y. Kong, X.N. Li, J. Meng, G.D. Shen, K.D. Wang, Z.J. Wang, W. Wei, J.X. Wu, J.W. Xia, H.M. Xie, W.J. Xie, Z. Xu, J.C. Yang, Y.Q. Yang, X. Yin, Y.J. Yuan, Y. Zhang
    IMP/CAS, Lanzhou, People’s Republic of China
  • Y.R. Lu
    PKU, Beijing, People’s Republic of China
 
  The SSC-LINAC is under design and construction as a linear injector for the Separated-Sector Cyclotron (SSC) of the Heavy Ion Research Facility at Lanzhou (HIRFL). The continuous-wave (CW) 4-rod radio-frequency quad-rupole (RFQ) of the SSC-LINAC has important progress in past years. In the autumn of 2016, the cavity has been operated with 35 kW on CW mode in automatic RF con-trolled mode during RF power commissioning, which is needed to accelerate 238U34+ beams. The beam transmis-sion efficiency, transverse emittance and energy spread has been obtained in beam commissioning. In this paper, the results of experiments will be presented and discussed in detail.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO054  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)