Author: Sun, L.T.
Paper Title Page
TUPO003 Development of CW Heavy Ion Linac at IMP 326
TUOP08   use link to see paper's listing under its alternate paper code  
 
  • X. Yin, H. Du, Y. He, Q.Y. Kong, X.N. Li, Z.S. Li, L.Z. Ma, J. Meng, C. Qian, L.T. Sun, K.D. Wang, J.X. Wu, J.W. Xia, W.J. Xie, Z. Xu, Y.Q. Yang, Q.G. Yao, Y.J. Yuan, W. Zhang, X.Z. Zhang, Y. Zhang, H.W. Zhao, Z.Z. Zhou
    IMP/CAS, Lanzhou, People’s Republic of China
  • J.E. Chen, S.L. Gao, G. Liu, Y.R. Lu, Z. Wang, X.Q. Yan, K. Zhu
    PKU, Beijing, People’s Republic of China
 
  A new heavy ion linac as the injector for the Separated Sector Cyclotron (SSC), named SSC-Linac[1], is being under constructed at the national laboratory Heavy Ion Research Facility in Lanzhou (HIRFL). The SSC-Linac mainly consists of a 4-rod RFQ and three IH-DTL cavities which can accelerate ion of A⁄q≤7from 3.73 keV/u to 1.025 MeV/u. Both of themoperating at 53.667MHz had been developed. In the commissioning, ions weresuccessfully accelerated to 0.295MeV/u by IH-DTL1. The beam commissioningof the IH-DTL2 which can accelerate the ion to 0.586MeV/u will come soon. In this paper, the recent R&D progress of the SSC-Linac including the development of key components and the beam commissioning results arepresented.  
slides icon Slides TUPO003 [7.335 MB]  
poster icon Poster TUPO003 [0.810 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO003  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPO005 Initial Beam Commissioning of LEAF at IMP 332
 
  • Y. Yang, W.P. Dou, X. Fang, Y.H. Guo, H. Jia, L. Jing, X.J. Liu, L. Lu, W. Lu, W. Ma, L.T. Sun, L.P. Sun, W. Wei, H.W. Zhao, Y.H. Zhai
    IMP/CAS, Lanzhou, People’s Republic of China
 
  A Low Energy intense-highly-charged ion Accelerator Facility (LEAF), which mainly includes an ECR ion source, LEBT and an 81.25 MHz RFQ, was designed to produce and accelerate heavy ions, from helium to uranium with A/Q between 2 and 7, to the energy of 0.5 MeV/u. The typical beam intensity is designed up to 2 emA CW for the uranium beam. The facility has been successfully commissioned with He+ (A/Q=4) and N2+ (A/Q=7) beams and accelerated the beams in the CW regime to the designed energy of 0.5 MeV/u. Beam properties and transmission efficiencies were measured, indicating a good consistency with simulated data. After having briefly recalled the project scope and parameters, this paper describes the beam commissioning strategy and detailed commissioning results.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO005  
About • paper received ※ 11 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO052 High Power Test of the LEAF-RFQ 808
 
  • L. Lu, Y. He, W. Ma, L.B. Shi, L.T. Sun, L.P. Sun, L. Yang, Y. Yang, H.W. Zhao
    IMP/CAS, Lanzhou, People’s Republic of China
 
  High power heavy ion drivers require a CW low-frequency accelerator for initial acceleration. A CW four-vane radio frequency quadrupole (RFQ) accelerator is designed to accelerate heavy ions A/q up to 7 from 14 keV/u to 500 keV/u, as a new injector for the Low Energy Accelerator Facility (LEAF) at Institute of Modern Physics (IMP). The measurements of low power test were reported previously. In this paper, the results of high power test of the RFQ, including the test of the acceleration systems and beam profiles, will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO052  
About • paper received ※ 07 September 2018       paper accepted ※ 08 October 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)