Author: Srinivasan, V.
Paper Title Page
TU2A03 Layout of the New FAIR Post-stripper DTL for Intense Heavy Ion Beams 303
 
  • S. Mickat, X. Du, P. Gerhard, L. Groening, M. Heilmann, M. Kaiser, A. Rubin, V. Srinivasan, W. Sturm
    GSI, Darmstadt, Germany
 
  The new post-stripper DTL at GSI shall accelerate uranium beams with space charge induced tune depressions of up to 37% to 11.4 MeV/u. Emittance dilution must be kept below few percent. However, the layout must also allow for delivery of lightest ions to just 3.0 MeV/u. This broad-banded range of requirements imposes huge challenges on the layout and fabrication especially of the cavities and drift tube magnets.  
slides icon Slides TU2A03 [4.777 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TU2A03  
About • paper received ※ 12 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO046 Status of the FAIR Proton Linac 787
 
  • C.M. Kleffner, S. Appel, R. Berezov, J. Fils, P. Forck, M. Kaiser, K. Knie, C. Mühle, S. Puetz, A. Schnase, G. Schreiber, A. Seibel, T. Sieber, V. Srinivasan, J. Trüller, W. Vinzenz, C. Will
    GSI, Darmstadt, Germany
  • A. Almomani, H. Hähnel, U. Ratzinger, M. Schuett, M. Syha
    IAP, Frankfurt am Main, Germany
 
  As part of the accelerator chain for antiproton production of the FAIR facility, a special high-intensity short pulsed 325 MHz proton linac is being developed. The Proton linac is designed to deliver a beam current of 70 mA with an energy of 68 MeV. A 2.45 GHz ECR source designed for the generation of 100 mA beams with an energy of 95 keV is currently being tested at CEA/Saclay. The production of the structure of the IAP ladder RFQ is nearly completed. First parts of the RFQ vacuum chambers have been successfully copperplated at the GSI. Seven Thales Klystrons have been delivered to GSI at the beginning of 2018 and are nearly ready for use. The completion of the setup of the HV modulator is expected end of the year 2018. The state of procurement and development of further accelerator components will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO046  
About • paper received ※ 12 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)