Author: Smith, B.G.
Paper Title Page
MOPO095 A Risk Based Approach to Improving Beam Availability at an Accelerator Facility 207
MOOP12   use link to see paper's listing under its alternate paper code  
 
  • W.C. Barkley, M.J. Borden, R.W. Garnett, M.S. Gulley, E.L. Kerstiens, M. Pieck, D. Rees, F.E. Shelley, B.G. Smith
    LANL, Los Alamos, New Mexico, USA
 
  Funding: United States Department of Energy
This paper de­scribes a risk-based ap­proach to im­prov­ing beam avail­abil­ity at an ac­cel­er­a­tor fa­cil­ity. Los Alamos Neu­tron Sci­ence Cen­ter (LAN­SCE), like many other ac­cel­er­a­tor fa­cil­i­ties, was built many years ago and has been re-pur­posed when new mis­sions were adopted. Many of the up­grades to the ac­cel­er­a­tor and beam­lines al­lowed im­prove­ments in the gen­eral area of the up­grade but large-scale, sys­tem-wide im­prove­ments were never ac­com­plished. Be­cause of this, the fa­cil­ity op­er­ates with a mix of old and new equip­ment of vary­ing con­di­tion. Lim­ited bud­gets have con­strained spend­ing for spares pro­cure­ment mak­ing it vital to pri­or­i­tize those items pre­dicted to have the high­est im­pact to avail­abil­ity, should they fail. A sys­tem­atic ap­proach is de­scribed where equip­ment is in­ven­to­ried, con­di­tion as­sessed, rated for po­ten­tial fail­ure and fi­nally com­piled into a risk-based pri­or­ity list.
 
poster icon Poster MOPO095 [0.332 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO095  
About • paper received ※ 21 September 2018       paper accepted ※ 08 October 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)