MOPO004 Commissioning of the SRF Booster Cavity for LEReC 40
 
  • W. Xu, A.V. Fedotov, T. Hayes, D. Holmes, G.T. McIntyre, K. Mernick, S.K. Seberg, F. Severino, K.S. Smith, R. Than, Q. Wu, B. P. Xiao, T. Xin, A. Zaltsman
    BNL, Upton, Long Island, New York, USA
 
  Funding: This work is supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. DOE.
One important component for LEReC project is a 704 MHz booster cavity, which was modified from the BNL ERL 704 MHz SRF gun cavity. The major modifications include converting the upstream cathode transportation to a proper beam pipe, adding a HOM coaxial line HOM damper to the downstream, retracting FPC insertions, and improvement of cryomodule layout. In the past one and half year, tremendous work was completed: the cavity was modified and tested vertically, FPC were conditioned, and HOM damper were designed and conditioned, cryomodule was re-assembled. The booster cavity cryomodule was successfully commissioned in mid October, and it was moved to LEReC location at RHIC tunnel 2 O’clock early November. This paper will report the configuration of the new cryomodule and its commissioning results.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO004  
About • paper received ※ 22 August 2018       paper accepted ※ 22 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)