Paper | Title | Page |
---|---|---|
TUPO109 | Electron Cloud Estimates for the Jefferson Lab EIC | 563 |
|
||
Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. In this work, we present preliminary estimates for electron cloud build-up and saturation for the ion ring of the Jefferson Laboratory Electron-Ion Collider (JLEIC) currently under development. Using the baseline ion ring design, we study the impact of various operational parameters on the behavior of the electron cloud for a 100 GeV proton beam, including estimated tune shifts. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO109 | |
About • | paper received ※ 12 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |