Paper |
Title |
Page |
MOPO092 |
A 3-gap Booster Cavity to Match Ion Source Potential to RFQ Acceptance |
196 |
MOOP01 |
|
|
- R.E. Laxdal, Z.T. Ang, T. Au, S. Kiy, S.D. Rädel, O. Shelbaya, V. Zvyagintsev
TRIUMF, Vancouver, Canada
|
|
|
The ISAC RFQ can accelerate ions with A/Q ration from 1 to 30 and requires an input energy of 2.04keV/u. The harsh environment of the ISAC on-line ISOL target facility makes it difficult to meet the energy for the heaviest masses. For these cases we have designed and installed a short three gap device that accelerates the beams produced at source potential to match the required energy for RFQ acceptance. The booster cavity operates at 11.7MHz, the RF frequency of the pre-buncher. The device can also be used as a second buncher to augment the acceptance in the RFQ or to improve the acceptance of higher space charge beams. The device will be described and the results of beam measurements will be given.
|
|
|
Slides MOPO092 [7.627 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO092
|
|
About • |
paper received ※ 14 September 2018 paper accepted ※ 19 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TU1A03 |
Status and Issues (Microphonics, LFD, MPS) with TRIUMF ARIEL e-Linac Commissioning |
286 |
|
- S.R. Koscielniak, M. Alcorta, F. Ames, E. Chapman, K. Fong, B. Humphries, O.K. Kester, D. Kishi, R.E. Laxdal, Y. Ma, T. Planche, M. Rowe, S.D. Rädel, V.A. Verzilov, Z.Y. Yao
TRIUMF, Vancouver, Canada
|
|
|
The ARIEL electron linac (e-linac) is designed to generate cw beams of up to 30 MeV and 10 mA for delivery to a photo-convertor. Bremsstrahlung induced fission of a production target yields neutron-rich rare isotope beams to be supplied to the ISAC experimental facilities. The beam power will eventually reach 300 kW, and a machine protection system (MPS) with 10 μs rapidity is essential. The e-linac, which adopts 1.3 GHz, 2K SRF technology, is composed of a 10 MeV single-cavity injector cryomodule (EINJ) and a 20 MeV two-cavity accelerator cryomodule (EACA). The latter has vector-sum control of two cavities driven from a single klystron. Beam commissioning of these systems is ongoing since 2016. The magnetic optics and MPS commissioning to 10 MeV is reported herein. Beam has been accelerated up to 25 MeV, and thread-ed to the high energy dump (EHD). A campaign to investigate microphonics driving terms, LN2 disturb-ances, and a ponderomotive instability in the EACA, is underway.
|
|
|
Slides TU1A03 [9.683 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TU1A03
|
|
About • |
paper received ※ 17 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|