WE2A01 |
First Acceleration at FRIB |
615 |
|
- G. Pozdeyev
FRIB, East Lansing, Michigan, USA
|
|
|
FRIB is now moving to commissioning interleaved with installation. The ECR, low energy transport and RFQ have been commissioned with beam By the time of the conference the 4K cryogenic system and first three beta 0.041 QWR cryomodules will be commissioned with first cold acceleration. The talk would focus on the hardware and beam performance.
|
|
|