TUPO017 The New Light Ion Injector for NICA 362
 
  • B. Koubek, M. Basten, H. Höltermann, H. Podlech, U. Ratzinger, A. Schempp, R. Tiede
    BEVATECH, Frankfurt, Germany
  • A.V. Butenko, D.E. Donets, B.V. Golovenskiy, A. Govorov, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.A. Monchinsky, D.O. Ponkin, K.V. Shevchenko, I.V. Shirikov, E. Syresin
    JINR, Dubna, Moscow Region, Russia
  • C. K. Kampmeyer, H. Schlarb
    DESY, Hamburg, Germany
 
  Within the upgrade scheme of the injection complex of the NICA project and after a successful beam commissioning of a heavy ion linac, Bevatech GmbH will build a first part of a new light ion linac as an injector for the Nuclotron ring. The linac will provide a beam of polarised protons and light ions with a mass to charge ratio up to 3 and an energy of 7 MeV/u. The mandate of the Linac does not only include the hardware for the accelerating structures, focusing magnets and beam diagnostic devices, but also the LLRF control soft- and hardware based on the MicroTCA.4 standard in collaboration with the MicroTCA Technology Lab at DESY. An overview of the Linac is presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO017  
About • paper received ※ 10 September 2018       paper accepted ※ 19 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TH1P02 Injection Complex Development for the NICA-project at JINR 663
 
  • A.V. Butenko, B.V. Golovenskiy, A. Govorov, A.D. Kovalenko, V.A. Monchinsky, A.V. Smirnov, G.V. Trubnikov
    JINR, Dubna, Moscow Region, Russia
  • D.E. Donets, K.A. Levterov, D.A. Lyuosev, A.A. Martynov, V.V. Mialkovskiy, D.O. Ponkin, K.V. Shevchenko, I.V. Shirikov, A.O. Sidorin
    JINR/VBLHEP, Dubna, Moscow region, Russia
  • H. Höltermann, H. Podlech, U. Ratzinger, A. Schempp
    BEVATECH, Frankfurt, Germany
  • T. Kulevoy
    ITEP, Moscow, Russia
  • S.M. Polozov
    MEPhI, Moscow, Russia
 
  The new accelerator complex Nuclotron-based Ion Collider fAcility (NICA) is still under construction at JINR, Dubna. Two Linacs should serve as injectors for this new accelerator complex. LU-20 as an Alvarez based lLinac for light polarized ions and the new Heavy Ion Linear Accelerator HILAC dedicated to heavy ion beam operation. Main results of the HILAC commissioning with carbon beam from the laser ion source should be discussed. Besides a new R&D-project is ongoing to developed superconducting cavities for a new light ion linear injector which created to upgrade the injector complex. The current status of linac design and results of the beam dynamics simulations and SRF technology developments should be presented as well.  
slides icon Slides TH1P02 [8.162 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TH1P02  
About • paper received ※ 17 September 2018       paper accepted ※ 21 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPO090 Measurements of the First Room Temperature CH Cavity for MYRRHA at IAP Frankfurt 193
 
  • K. Kümpel, S. Lamprecht, P. Müller, N.F. Petry, H. Podlech, S. Zimmermann
    IAP, Frankfurt am Main, Germany
 
  Funding: This work has been supported by MYRTE which is funded by the European Commission under Project-ID 662186.
The MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) Project is a planned accelerator driven system (ADS) for the transmutation of long-living radioactive waste. A critical passage for the beam quality and especially for the emittance is the injector, which for the MYRRHA project consists of a 4-Rod RFQ, two Quarter Wave Rebunchers (QWR) and a total of 16 normal conducting CH-DTL cavities. The first installment of the MYRRHA injector in Louvein-La-Neuve (Belgium) will include an ion source, a RFQ, the QWRs and the first seven CH DTL cavities. This paper will report on the status of the low level tests on CHs 1 and 2 as well as on further developments on CHs 8-15.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO090  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPO101 LINAC-multitool - an Open Source Java-toolkit 217
 
  • M. Schwarz, D. Bade, J. Corbet, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  Funding: Work supported by BMBF contr. No. 05P15RFRBA and HIC for FAIR
Dedicating more precious time to advanced research instead of spending it towards timeconsuming routine tasks is a desirable goal in particle accelerator simulation and development. Requirements engineering was started at IAP in order to identify routine processes at our institute’s R&D that can be automated or simplified. Results indicated that there were several areas to consider: Bead pull measurements, data processing and visualization for the beam dynamics code LORASR, CST field map processing for the use with TraceWin, conversion between different particle distribution data formats and more. Subsequently development of the LINAC-Multitool started to rationalize these processes and replace preexisting scripts also to ensure consistency of results and increase transparency and reliability of computation. In order to guarantee maintainability, expandability and platform independence, LINAC-Multitool is programmed using Java and will be open source. This contribution presents the current state of development.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO101  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TU2A01 First Acceleration of Heavy Ion Beams with a Superconducting Continuous Wave HIM/GSI CW-linac 297
 
  • W.A. Barth, K. Aulenbacher, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  First acceleration of heavy ion beams with a superconducting continuous wave HIM/GSI CW-Linac After successful RF-testing of a new superconducting Linac RF-cavity at GSI Helmholtzzentrum für Schwerionenforschung and a short commissioning and ramp up time of some days, this 15-gaps Crossbar H-cavity accelerated first time heavy ion beams with full transmission up to the design beam energy. The design acceleration gain of 3.5 MV inside a length of less than 70 cm has been verified with heavy ion beam of up to 1.5 particle mkA. The measured beam parameters show a nice beam quality. The machine commissioning with beam is a milestone of the R&D work of Helmholtz Institute Mainz and GSI in collaboration with Goethe University Frankfurt in development of the superconducting heavy ion continuous wave linear accelerator CW-Linac.  
slides icon Slides TU2A01 [3.385 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TU2A01  
About • paper received ※ 11 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPO084 Beam Dynamics Simulations for the New Superconducting CW Heavy Ion LINAC at GSI 525
SPWR034   use link to see paper's listing under its alternate paper code  
 
  • M. Schwarz, M. Basten, M. Busch, H. Podlech
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  Funding: Work supported by BMBF contr. No. 05P15RFRBA, EU Framework Programme H2020 662186 (MYRTE) and HIC for FAIR
For future experiments with heavy ions near the coulomb barrier within the super-heavy element (SHE) research project a multi-stage R&D program of GSI/HIM and IAP is currently in progress. It aims for developing a supercon-ducting (sc) continuous wave (CW) LINAC with multiple CH cavities as key components downstream the High Charge State Injector (HLI) at GSI. The LINAC design is challenging due to the requirement of intense beams in CW mode up to a mass-to-charge ratio of 6, while covering a broad output energy range from 3.5 to 7.3 MeV/u with unchanged minimum energy spread. Testing of the first CH-cavity in 2016 demonstrated a promising maximum accelerating gradient of Ea = 9.6 MV/m; the worldwide first beam test with this sc multi-gap CH-cavity in 2017 was a milestone in the R&D work of GSI/HIM and IAP. In the light of experience gained in this research so far, the beam dynamics layout for the entire LINAC has recently been updated and optimized.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO084  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO061 Beam Characterization of the MYRRHA-RFQ 830
SPWR017   use link to see paper's listing under its alternate paper code  
 
  • P.P. Schneider, M. Droba, O. Meusel, H. Podlech, A. Schempp
    IAP, Frankfurt am Main, Germany
  • D. Noll
    CERN, Geneva, Switzerland
 
  Funding: This work is supported by the German Federal Ministry of Education and Research (BMBF) #05P15RFRBA and HORIZON 2020 for the MYRRHA project #662186 and HIC for FAIR.
The Linear Accelerator for the MYRRHA project* is under construction. In a first step the linac up to 100 MeV will be realized. The LEBT section has been set into operation in Belgium and the RFQ is installed in summer 2018. A system to analyze the ion beam consisting of a slit-grid emittance scanner, a beam dump and a momentum spectrometer, called diagnostic train descripted in **, will be set on the rails to characterize the beam at the RFQ injection point. The results will be used to adjust the optimal matching for the RFQ. After the measurements downstream the LEBT, the diagnostic train begins its journey along the beam line and at the first station the RFQ is installed. The accelerated beam of the RFQ is then analyzed and optimized. In addition to optimization of transmission the artificial production of beam offsets in the LEBT is of special interest. These will be measured at the injection point to estimate the range of possible offsets. In the following measurements these offsets will be used to study the influence of the offsets on the RFQ performance. Furthermore, the RFQ parameters are varied to see their influence on the beam transport, transmission and beam quality.
* H.Aı̈t Abderrahim et al. "MYRRHA: A multipurpose accelerator driven system for research & development", 2001
** 1st Experiments at the CW-Operated RFQ for Intense Proton Beams, LINAC16
 
poster icon Poster THPO061 [4.610 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO061  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO072 Cryogenic Tests of the Superconducting β=0.069 CH-cavities for the HELIAC-project 855
SPWR010   use link to see paper's listing under its alternate paper code  
 
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher, W.A. Barth, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, M. Heilmann, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  In the future the existing UNILAC (UNIversal Linear Accelerator) at GSI will be most exclusively used as an injector for FAIR to provide short pulse high intensity heavy ion beams at low repetition rates [Barth3]. A new superconducting (sc) continuous wave (cw) high intensity heavy ion Linac should provide ion beams with max. duty factor above the coulomb barrier for the Super Heavy Element (SHE) program at GSI. The fundamental Linac design comprises a low energy beam transport (LEBT)-section followed by a sc Drift Tube Linac (DTL) consisting of sc Crossbar-H-mode (CH) structures for acceleration up to 7.3 MeV/u [*]. After the successful test and commissioning of the first demonstrator section with heavy ion beam from the HLI in 2017 [**], the next two sc CH-structures have been constructed and the first one has been extensively tested at cryogenic temperatures at the Institute for Applied Physics (IAP) at Goethe University Frankfurt (GUF). The results of the final cold test of the first CH-structure as well as the next steps realizing a new sc cw heavy ion LINAC at GSI will be presented.
[*]W. Barth et al., "Further investigations for a superconducting cw-Linac at GSI"
[**]W. Barth et al., "First high intensity heavy ion beam tests with a superconducting multi gap CH-cavity"
 
poster icon Poster THPO072 [1.150 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO072  
About • paper received ※ 11 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO073 RF Commissioning of the Superconducting 217 MHz CH Cavity for Heavy Ions and First Beam Operation 859
 
  • F.D. Dziuba, K. Aulenbacher, W.A. Barth, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • W.A. Barth, M. Heilmann, J. Salvatore, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  Future research programs at GSI in the field super heavy element (SHE) synthesis require high intense heavy ion beams above the coulomb barrier and high average particle currents. The upcoming demands exceed the technical opportunities of the existing UNIversal Linear ACcelerator (UNILAC). Consequently, a new dedicated superconducting (sc) continuous wave (cw) linac is crucial to keep the SHE research program at GSI competitive on a high level. Recently the first linac section, serving as a prototype to demonstrate the reliable operability of 217 MHz multi gap crossbar-H-mode (CH) cavities under a realistic accelerator environment, has been extensively tested with a heavy ion beam delivered from the GSI High Charge State Injector (HLI). Fulfilling its role as a key component of the whole demonstrator setup. The first sc 217 MHz CH cavity (CH0) successfully accelerated heavy ions up to the design beam energy and even beyond at high beam intensities and full transmission. In this contribution the rf commissioning and the first beam operation of the cavity is presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO073  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO107 High Power Coupler R&D for Superconducting CH-cavities 920
SPWR025   use link to see paper's listing under its alternate paper code  
 
  • J. List, K. Aulenbacher, W.A. Barth, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • W.A. Barth, M. Heilmann, J. Salvatore, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  The upcoming demands of the future research programs at GSI exceed the technical opportunities of the existing UNIversal Linear ACcelerator (UNILAC). Besides, the machine will be exclusively used as an injector for FAIR (Facility for Antiproton and Ion Research) providing high power heavy ion beams at a low repetition rate for injection into the synchrotron. A new dedicated superconducting (sc) continuous wave (cw) Linac is crucial to keep the research program competitive. The first part of the cw-linac, comprising a 217 MHz multi gap Crossbar-H-mode (CH) cavity surrounded by two sc solenoids inside a cryostat, already served as a prototype demonstrating reliable operability in a realistic accelerator environment. A sufficient high power RF-coupling concept is needed to feed this newly developed cw-RF cavity with up to 5 kW of RF-power. A high power coupler test stand was recently built to provide for a testing environment; further upgrade measures of this test area are foreseen. This contribution deals with the recent coupler R&D for the demonstrator set up. Besides simulations of thermal losses at the coupler (inside the RF-cavity) will be shown as well.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO107  
About • paper received ※ 12 September 2018       paper accepted ※ 19 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)