| Paper | 
        Title | 
        Page | 
    
    
        | WE1A06 | 
        Pulse-to-pulse Beam Modulation for 4 Storage Rings with 64 Pulsed Magnets | 
        609 | 
    
    
        |   | 
        
                - Y. Enomoto, K. Furukawa, T. Kamitani, F. Miyahara, T. Natsui, M. Satoh, K. Yokoyama, M. Yoshida
 
                       KEK, Ibaraki, Japan 
                - H.S. Saotome
 
                       Kanto Information Service (KIS), Accelerator Group, Ibaraki, Japan 
                - S. Ushimoto
 
                       Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan 
          | 
          | 
    
    
        |   | 
        
        The KEK injector linac has delivered electrons and positrons for particle physics and photon science experiments for more than 30 years. It is planned to inject electron and positron beams with energies from 2.5 GeV to 7 GeV pulse-by-pulse at 50 Hz into the dual ring SuperKEKB collider and two light source storage rings. As the beam quality requirement from SuperKEKB is demanding, the beam orbit and optics conditions have to be maintained precisely. To that end 64 newly designed pulsed magnets were installed. Quadrupole magnets with the inductance of 1 mH are driven by power supplies with pulses up to 330 A and 0.5 ms, which recover the energy stored in coils up to 65%. Orbit corrector magnets with the inductance of 3 mH are driven with bipolar pulsed power supplies up to 10 A. Those power supplies are controlled under the event-based synchronized controls and monitored pulse-by-pulse, and are confirmed to have the stability over weeks within 0.1%. The details of the design and the operational performance will be reported.
         | 
          | 
    
    
        
            
         | 
        
           Slides WE1A06 [6.694 MB]
         | 
          | 
    
    
    	  | DOI • | 
        reference for this paper 
              ※ https://doi.org/10.18429/JACoW-LINAC2018-WE1A06
         | 
          | 
    
    
    	  | About • | 
        paper received ※ 11 September 2018       paper accepted ※ 19 September 2018        issue date ※ 18 January 2019 | 
          | 
    
    
    	  | Export • | 
        reference for this paper using 
              ※ BibTeX, 
              ※ LaTeX, 
              ※ Text/Word, 
              ※ RIS, 
              ※ EndNote (xml)
         | 
          | 
    
    
        |   |