MO1P03 Status of the ESS Linac 35
 
  • A. Sunesson, P. Arnold, S.L. Birch, R. Garoby, M. Jensen, M. Lindroos, C.A. Martins, A. Nordt, T.J. Shea, J.G. Weisend
    ESS, Lund, Sweden
 
  The European Spallation Source under construction in Lund (Sweden) uses a 2 GeV-5MW pulsed superconducting linac as proton driver. Normal conducting accelerating structures are used up to 92 MeV and superconducting structures up to 2 GeV. Most linac components are designed and procured as in-kind contributions by institutes/laboratories in the European partner countries. Installation of the Ion source delivered by INFN-Catania started end 2017. Installation of more components and infrastructure progresses at a high pace. Commissioning of the normal conducting linac section will take place in parallel with installation of the superconducting section. Beam commissioning of the superconducting section will be done starting in 2021, interlaced with the installation of additional high beta cryomodules. Beam will be sent to the target in 2022, initially at an energy of 1.3 GeV. Start of the User Programme is scheduled in 2023, when some neutron instruments will be ready and end of construction is in 2025, with the full set of instruments operational. This paper reports the status of linac components construction, the progress with installation on site, and the overall project schedule.  
slides icon Slides MO1P03 [14.161 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MO1P03  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)