Survey and Alignment System of 100 MeV/100 kW Electron Linear Accelerator |
87 |
SPWR006 |
|
|
- O. Bezditko, I.I. Karnaukhov, A.Y. Zelinsky
NSC/KIPT, Kharkov, Ukraine
|
|
|
For successful operation and working of electron linear accelerator of "NEUTRON SOURCE" driver it is necessary that all the acceleration sections, the quadrupole triplets, the quadrupole lenses, the dipole magnets, the scanning magnets and the chicane should be installed in design position according design parameters. Accuracies of all electromagnetic elements installation are 150 mkm for all three rotation freedom. The whole process, fiducialization and developing of survey net, alignment is controlled by laser tracker Leica AT 401.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO028
|
|
About • |
paper received ※ 12 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|