Author: Karnaukhov, I.I.
Paper Title Page
MOPO028 Survey and Alignment System of 100 MeV/100 kW Electron Linear Accelerator 87
SPWR006   use link to see paper's listing under its alternate paper code  
 
  • O. Bezditko, I.I. Karnaukhov, A.Y. Zelinsky
    NSC/KIPT, Kharkov, Ukraine
 
  For successful operation and working of electron linear accelerator of "NEUTRON SOURCE" driver it is necessary that all the acceleration sections, the quadrupole triplets, the quadrupole lenses, the dipole magnets, the scanning magnets and the chicane should be installed in design position according design parameters. Accuracies of all electromagnetic elements installation are 150 mkm for all three rotation freedom. The whole process, fiducialization and developing of survey net, alignment is controlled by laser tracker Leica AT 401.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO028  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)