Paper |
Title |
Page |
THPO047 |
SPIRAL2 Injector Commissioning |
790 |
THOP01 |
|
|
- R. Ferdinand, M. Di Giacomo, H. Franberg, O. Kamalou, J.-M. Lagniel, G. Normand, A. Savalle, F. Varenne
GANIL, Caen, France
- D. Uriot
CEA/DRF/IRFU, Gif-sur-Yvette, France
|
|
|
The SPIRAL2 injector is composed of two ion sources (p/d and heavy ions up to A/Q=3) followed by a 730 keV/u RFQ. Beam commissioning has started in 2014 in parallel with the superconducting linac and HEBT installations. The RFQ beam commissioning started soon after the first RF conditioning done in October 2015. This paper describes the RFQ beam measurements done on the diagnostic plate for the reference particles (H+, 4He2+ and recently 18O6+) and the difficulties encountered for the RFQ commissioning at the A/Q=3 field level.
|
|
|
Slides THPO047 [7.846 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-THPO047
|
|
About • |
paper received ※ 11 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|