Author: Hierholzer, M.
Paper Title Page
MOPO038 RF Operation Experience at the European XFEL 109
MOOP09   use link to see paper's listing under its alternate paper code  
 
  • J. Branlard, V. Ayvazyan, Ł. Butkowski, M.K. Grecki, M. Hierholzer, M.G. Hoffmann, M. Hoffmann, M. Killenberg, D. Kostin, T. Lamb, L. Lilje, U. Mavrič, M. Omet, S. Pfeiffer, R. Rybaniec, H. Schlarb, Ch. Schmidt, N. Shehzad, V. Vogel, N. Walker
    DESY, Hamburg, Germany
 
  After its successful commissioning which took place during the first half of 2017, the European X-ray free electron laser is in now in regular operation delivering photons to users since September 2017. This paper presents an overview on the experience gathered during the first couple of years of operation. In particular, the focus is set on RF operation, maintenance activities, availability and typical failures. A first look on machine performance in terms of RF and beam stability, energy reach, radiation related investigations and microphonics studies will also be presented.  
slides icon Slides MOPO038 [2.421 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO038  
About • paper received ※ 11 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPO039 Status Update of the Fast Energy Corrector Cavity at FLASH 112
 
  • S. Pfeiffer, J. Branlard, Ł. Butkowski, M. Hierholzer, M. Hoffmann, K. Honkavaara, H. Schlarb, Ch. Schmidt, S. Schreiber, M. Vogt, J. Zemella
    DESY, Hamburg, Germany
  • M. Fakhari
    CFEL, Hamburg, Germany
 
  Funding: The work is part of EuCARD-2, partly funded by the European Commission, GA 312453.
Linear accelerator facilities driving a free-electron laser require femtosecond precision synchronization between external laser systems and the electron beam. Such high precision is required for pump-probe experiments and also for example for the electron bunch injection into a plasma bubble for laser plasma acceleration. An upgrade of the fast intra-train beam-based feedback system is planned at the Free-Electron Laser FLASH in Hamburg, Germany. This linear accelerator is based on superconducting (SRF) technology operating with pulse trains of maximum 1 MHz bunch repetition rate. Arrival time fluctuations of the electron beam are correctable by introducing small energy modulations prior to the magnetic bunch compressor. This contribution focuses on the design and the characterization of a normal-conducting RF (NRF) cavity with large bandwidth, mandatory to correct fast arrival time fluctuations. The cavity has recently been installed in the FLASH beamline. First measurements with the new cavity will be presented.
 
poster icon Poster MOPO039 [1.884 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO039  
About • paper received ※ 13 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPO102 Progress of MicroTCA.4 based LLRF System of TARLA 220
 
  • C. Gumus, M. Hierholzer, H. Schlarb, Ch. Schmidt
    DESY, Hamburg, Germany
  • A.A. Aksoy, A. Aydin, Ç. Kaya
    Ankara University, Accelerator Technologies Institute, Golbasi / Ankara, Turkey
  • O.F. Elcim
    Ankara University Institute of Accelerator Technologies, Golbasi, Turkey
 
  The Turkish Accelerator and Radiation Laboratory in Ankara (TARLA) is constructing a 40 MeV Free Electron Laser with continuous wave RF operation. DESY is responsible for delivering a turnkey LLRF system based on MicroTCA.4 standard that will be used to control four superconducting (SC) TESLA type cavities as well as the two normal conducting buncher cavities. This highly modular system is further used to control the mechanical tuning of the SC cavities by control of piezo actuators and mechanical motor tuners. With the usage of ChimeraTK framework, integration to EPICS control system is also implemented. This poster describes the system setup and integration to the existing accelerator environment with hardware and software components along with the latest updates from the facility.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO102  
About • paper received ※ 10 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)