Author: Fu, S.
Paper Title Page
MO1A01 CSNS Front End and Linac Commissioning 1
 
  • S. Fu, H.C. Liu, H.F. Ouyang, S. Wang
    IHEP, Beijing, People’s Republic of China
  • J. Li, J. Peng
    CSNS, Guangdong Province, People’s Republic of China
 
  The China Spallation Neutron Source(CSNS) accelera-tor systems is designed to deliver a 1.6GeV, 100kW proton beam to a solid metal target for neutron scattering research. The accelerator consists of a front end, an 80MeV DTL linac, and a 1.6GeV Rapid Cycling Syn-chrotron (RCS). In August 2017 the first 1.6GeV proton beam hit on the tungsten target and production neutrons were monitored. This paper will report the major steps and results of the machine commissioning and beam commissioning of the CSNS front end and linac. In the first section, a brief introduction of the CSNS accelerator design and present status will be presented. Then, we will share our commissioning experience in the front end and the DTL linac in the following sections.  
slides icon Slides MO1A01 [9.123 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MO1A01  
About • paper received ※ 12 September 2018       paper accepted ※ 19 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPO114 Beam Dynamics Studies for the CSNS DTL Due to a Quadrupole Fault 573
 
  • J. Peng, M.T. Li, Y.D. Liu, X.H. Lu, X.B. Luo
    CSNS, Guangdong Province, People’s Republic of China
  • Y.W. An, S. Fu, L. Huang, M.Y. Huang, Y. Li, Z.P. Li, S. Wang, S.Y. Xu, Y. Yuan
    IHEP, Beijing, People’s Republic of China
 
  The China Spallation Neutron Source(CSNS) accelera-tor systems is designed to deliver a 1.6GeV, 100kW pro-ton beam to a solid metal target for neutron scattering research. It consists of a 50keV H Ion Source, a 3MeV Radio Frequency Quadrupole (RFQ), an 80MeV Drift Tube Linac (DTL), and a 1.6GeV Rapid-cycling Synchro-tron (RCS). The DTL consists of four tanks. In 2017, three of four tanks have been commissioned successfully, and beam has been accelerated to 61MeV with nearly 100% transmission. However, in July 2017, one quadrupole contained in the drift tube was found fault, the beam transmission decreased to 80%. A new lattice has been designed and the 100% transmission has recovered. In January 2018, the last tank of the DTL has been commissioned and accelerated the H beam to the design energy of 80MeV for the first time. The commissioning progress and the measurement results before and after lattice adjustment will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO114  
About • paper received ※ 12 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO030 Operation Experience of the CSNS DTL 744
 
  • H.C. Liu, Q. Chen, S. Fu, K.Y. Gong
    IHEP, Beijing, People’s Republic of China
  • M.X. Fan, A.H. Li, B. Li, J. Peng, P.H. Qu, Y. Wang, X.L. Wu
    CSNS, Guangdong Province, People’s Republic of China
 
  The China Spallation Neutron Source (CSNS) Drift tube linac (DTL) accelerates H beam from 3 to 80MeV with 4 independent tanks. The 80MeV beam acceleration was achieved in January 2018. The linac is a key to the reliability of the whole CSNS facility since all the beams stop when these upstream facilities fail. Many efforts have been made for DTL reliable operation. This paper presents the operation experience learned in DTL com-missioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO030  
About • paper received ※ 28 August 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPO039 The Status of CSNS Front End 771
 
  • H. Li, X. Cao, W. Chen, T. Huang, S. Liu, K. Xue
    CSNS, Guangdong Province, People’s Republic of China
  • S. Fu, Y.J. Lv, H.F. Ouyang, Y.C. Xiao
    IHEP, Beijing, People’s Republic of China
 
  CSNS front end is currently under running, which consists of a H penning ion source(IS), a low energy beam transport(LEBT), a radio frequency quadrupole (RFQ) and a medium energy beam transport(MEBT). CSNS ion source is a type of Penning surface plasma source, similar to ISIS ion source. Cesium is used to enhance the H ion production efficiency. The ion source is running with duty factor of 1.25%(25Hz and 500us). Normally, 40mA H beam from ion source with 50keV can be delivered into LEBT. Three solenoids and two direction magnets are employed to transport and match the beam from the ion source into the RFQ. The pre-chopper is installed at the end of LEBT. The chopper mainly works at 3.8-4.2 kV and 1 MHz rate, which is about the RF frequency of the ring at injection. The rise time is less than 10ns,which fulfills the requirement of ring injection. For the RFQ, it is a 324MHz 4-vane type with a output energy of 3.0MeV and the length of 3.62m. The input cavity power is about 400kW. During commissioning, 16mA H beam can be obtained at the exit of RFQ, and the RFQ transmission rate is up to 94%.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO039  
About • paper received ※ 03 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)