The ARIEL electron linac (e-linac) is designed to generate cw beams of up to 30 MeV and 10 mA for delivery to a photo-convertor. Bremsstrahlung induced fission of a production target yields neutron-rich rare isotope beams to be supplied to the ISAC experimental facilities. The beam power will eventually reach 300 kW, and a machine protection system (MPS) with 10 μs rapidity is essential. The e-linac, which adopts 1.3 GHz, 2K SRF technology, is composed of a 10 MeV single-cavity injector cryomodule (EINJ) and a 20 MeV two-cavity accelerator cryomodule (EACA). The latter has vector-sum control of two cavities driven from a single klystron. Beam commissioning of these systems is ongoing since 2016. The magnetic optics and MPS commissioning to 10 MeV is reported herein. Beam has been accelerated up to 25 MeV, and thread-ed to the high energy dump (EHD). A campaign to investigate microphonics driving terms, LN2 disturb-ances, and a ponderomotive instability in the EACA, is underway.
|
|
|
Slides TU1A03 [9.683 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TU1A03
|
|
About • |
paper received ※ 17 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPO014 |
TRIUMF ISAC LINAC Developments and Upgrades |
355 |
|
- Z.T. Ang, T. Au, Y. Bylinskii, K. Fong, J.J. Keir, D. Lang, R.E. Laxdal, R. Leewe, B.S. Waraich, Z.Y. Yao, Q. Zheng, V. Zvyagintsev
TRIUMF, Vancouver, Canada
|
|
|
TRIUMF ISAC accelerator complex is in consists of ISAC-I room temperature linac and ISAC-II superconducting linac structure. ISAC-I linac has seventeen RF systems in operation for about twenty years, and ISAC-II linac has forty superconducting QWR RF cavities in operation for more than ten years. A small ISAC booster 3-gap structure at 11.78 MHz located in upstream of RFQ has been designed and installed for energy matching to RFQ. A sliding mode extremum seeking control for LLRF control was developed and implemented in operation. Six of DTL systems have been working in the control mode. Two of them had been commissioning and in operation one and half year reliably. RFQ, two more DTL system, HEBT rebuncher and DSB buncher system will be upgraded in the sliding mode control soon. Twenty ISAC-II SBC superconducting cavity RF power amplifiers were upgraded from YV-229 triode tube amplifier into solid state amplifier(SSA). The prototype and four SSAs have been commissioned in 2017 and in operation successfully. The rest of 16 SSA have been tested in RF lab and installed for operation at the mid of this year.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO014
|
|
About • |
paper received ※ 04 September 2018 paper accepted ※ 19 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPO020 |
Microphonics Investigation of ARIEL e-Linac Cryomodules |
370 |
|
- Y. Ma, K. Fong, M. Keikha, J.J. Keir, D. Kishi, S.R. Koscielniak, D. Lang, R.E. Laxdal, R.R. Nagimov, Z.Y. Yao, Q. Zheng, V. Zvyagintsev
TRIUMF, Vancouver, Canada
- L. Lilje
DESY, Hamburg, Germany
|
|
|
Now the stage of the 30MeV portion of ARIEL (The Advanced Rare Isotope Laboratory) e-Linac is under commissioning which includes an injector cryomodule (ICM) and the 1st accelerator cryomodule (ACM1) with two cavities configuration. In this paper, the progress of the microphonics investigation and suppression of ICM and ACM1 is presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO020
|
|
About • |
paper received ※ 12 September 2018 paper accepted ※ 20 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|