MOPO036 Status of the 10 MW MBKs during Commissioning of the European XFEL in DESY 102
MOOP04   use link to see paper's listing under its alternate paper code  
 
  • V. Vogel (Fogel), Ł. Butkowski, A. Cherepenko, S. Choroba, J. Hartung
    DESY, Hamburg, Germany
 
  At present 26 RF stations for European XFEL are in operation. Each of the RF stations consists of a HV modulator located in a separate building on the DESY campus, up to 1600 m long 10 kV HV cables that connect the modulator and the HV pulse transformer located in the underground tunnel, 120kV, 3 m long HV cable connecting the HV pulse transformer and the connection module of the horizontal multi-beam klystron. Two RF stations of the injector have already achieved about 20000 hours of operation, RF stations of the XFEL bunch compressor area have operated up to 11000 hours and in the XFEL main linac up to 8000 hours. To increase the lifetime of the klystrons, we use a fast protection system (KLM) that is based on the comparison of the actual RF shape and the expected RF shape. In the case of a difference exceeding a certain margin, for example, in the case of RF breakdown in a klystron or RF breakdown in a waveguide system, the KLM quickly, shorter than 500 ns, switches off the input RF signal. Thus, it does prevents the vacuum level in the klystron worsen too much or it minimizes the RF overvoltage time at the output windows of the klystron in case of breakdown in waveguides.  
slides icon Slides MOPO036 [5.241 MB]  
poster icon Poster MOPO036 [0.658 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-MOPO036  
About • paper received ※ 05 September 2018       paper accepted ※ 19 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)