Author: Chen, W.
Paper Title Page
THPO039 The Status of CSNS Front End 771
 
  • H. Li, X. Cao, W. Chen, T. Huang, S. Liu, K. Xue
    CSNS, Guangdong Province, People’s Republic of China
  • S. Fu, Y.J. Lv, H.F. Ouyang, Y.C. Xiao
    IHEP, Beijing, People’s Republic of China
 
  CSNS front end is currently under running, which consists of a H penning ion source(IS), a low energy beam transport(LEBT), a radio frequency quadrupole (RFQ) and a medium energy beam transport(MEBT). CSNS ion source is a type of Penning surface plasma source, similar to ISIS ion source. Cesium is used to enhance the H ion production efficiency. The ion source is running with duty factor of 1.25%(25Hz and 500us). Normally, 40mA H beam from ion source with 50keV can be delivered into LEBT. Three solenoids and two direction magnets are employed to transport and match the beam from the ion source into the RFQ. The pre-chopper is installed at the end of LEBT. The chopper mainly works at 3.8-4.2 kV and 1 MHz rate, which is about the RF frequency of the ring at injection. The rise time is less than 10ns,which fulfills the requirement of ring injection. For the RFQ, it is a 324MHz 4-vane type with a output energy of 3.0MeV and the length of 3.62m. The input cavity power is about 400kW. During commissioning, 16mA H beam can be obtained at the exit of RFQ, and the RFQ transmission rate is up to 94%.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO039  
About • paper received ※ 03 September 2018       paper accepted ※ 20 September 2018       issue date ※ 18 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)