Paper |
Title |
Page |
TUPO113 |
Beam Dynamics Studies Through Dielectric THz Accelerating Structures |
569 |
|
- R. Apsimon, G. Burt, A.L. Healy, S.P. Jamison
Cockcroft Institute, Lancaster University, Lancaster, United Kingdom
- R.B. Appleby, E.J.H. Smith
UMAN, Manchester, United Kingdom
- A. Latina
CERN, Geneva, Switzerland
|
|
|
As conventional RF accelerating schemes approach the physical limit of accelerating gradient, the accelerator community is increasingly looking at novel accelerating techniques to overcome these limitations. Moving from the RF to the THz frequency range, higher acceleration gradients of high energy beams can be achieved in compact structures. Beam dynamics studies are crucial as part of the design of novel accelerating structures to maximise the output beam current as well as the accelerating gradient. In this paper we present beam dynamics simulations through dielectric lined waveguide structures using novel techniques to simulate broadband signals for particle tracking studies in RF-Track. The beam parameters through the structure are optimised and we study the dynamics of general broadband accelerating structures.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-TUPO113
|
|
About • |
paper received ※ 13 September 2018 paper accepted ※ 21 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPO108 |
Development of an High Gradient Side Coupled Cavity for PROBE |
924 |
THOP08 |
|
|
- S. Pitman, R. Apsimon, G. Burt
Cockcroft Institute, Lancaster University, Lancaster, United Kingdom
- N. Catalán Lasheras, A. Grudiev, W. Wuensch
CERN, Geneva, Switzerland
- H.L. Owen
UMAN, Manchester, United Kingdom
|
|
|
The PROBE project aims to develop a high gradient proton accelerator for protons with energy around 250-350 MeV for proton radiography. Detailed studies have shown that the optimum design is a side coupled cavity at S-band. With an aperture of 8 mm a gradient of 54 MV/m can be obtained with 13 MW of RF power in a 30 cm structure. A prototype cavity has been machined by VDL and diffusion bonded by Bodycote. We present initial measurements of the prototype.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2018-THPO108
|
|
About • |
paper received ※ 17 September 2018 paper accepted ※ 21 September 2018 issue date ※ 18 January 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|