| Paper | 
        Title | 
        Page | 
    
    
        | TU2A04 | 
        Progress Report on LIPAC | 
        308 | 
    
    
        |   | 
        
                - M. Sugimoto, T. Akagi, T. Ebisawa, Y. Hirata, R. Ichimiya, A. Kasugai, K. Kondo, S. Maebara, K. Sakamoto, T. Shinya
 
                       QST, Aomori, Japan 
                - P. Abbon, N. Bazin, B. Bolzon, N. Chauvin, S. Chel, R. Gobin, J. Marroncle, B. Renard
 
                       CEA/IRFU, Gif-sur-Yvette, France 
                - L. Antoniazzi, L. Bellan, D. Bortolato, M. Comunian, E. Fagotti, F. Grespan, M. Montis, A. Palmieri, A. Pisent, F. Scantamburlo
 
                       INFN/LNL, Legnaro (PD), Italy 
                - P.-Y. Beauvais, H. Dzitko, D. Gex, R. Heidinger, A. Jokinen, I. Moya, G. Phillips
 
                       Fusion for Energy, Garching, Germany 
                - P. Cara
 
                       IFMIF/EVEDA, Rokkasho, Japan 
                - D. Gavela, D. Jiménez-Rey, I. Kirpitchev, J. Mollá, P. Méndez, I. Podadera, D. Regidor, R. Varela, M. Weber
 
                       CIEMAT, Madrid, Spain 
                - J. Knaster
 
                       F4E, Barcelona, Spain 
                - G. Pruneri
 
                       Consorzio RFX, Associazione Euratom-ENEA sulla Fusione, Padova, Italy 
          | 
          | 
    
    
        |   | 
        
        International Fusion Materials Irradiation Facility (IFMIF) is the neutron source for simulating fusion reactor environment using two 40 MeV/125 mA CW D+ beams. LIPAc facility is under construction in Rokkasho for validating 9 MeV/125 mA CW linac technology as a prototype of the IFMIF accelerator. Commissioning of 5 MeV CW RFQ is underway after the completion of installation of RFQ, MEBT, diagnostic plate. low power beam dump, RF power system and their auxiliaries. As the first step, high power RF conditioning is planned to complete in early 2018 and beam commissioning will start with stepwise approach at the same time. The status of LIPAc construction for preparing 9 MeV acceleration and results of RFQ beam commissioning are presented.
         | 
          | 
    
    
        
            
         | 
        
           Slides TU2A04 [9.651 MB]
         | 
          | 
    
    
    	  | DOI • | 
        reference for this paper 
              ※ https://doi.org/10.18429/JACoW-LINAC2018-TU2A04
         | 
          | 
    
    
    	  | About • | 
        paper received ※ 12 September 2018       paper accepted ※ 21 September 2018        issue date ※ 18 January 2019 | 
          | 
    
    
    	  | Export • | 
        reference for this paper using 
              ※ BibTeX, 
              ※ LaTeX, 
              ※ Text/Word, 
              ※ RIS, 
              ※ EndNote (xml)
         | 
          | 
    
    
        |   | 
    
    
        | THPO062 | 
        IFMIF/EVEDA RFQ Preliminary Beam Characterization | 
        834 | 
    
    
        |   | 
        
                - E. Fagotti, L. Antoniazzi, L. Bellan, M. Comunian, F. Grespan, M. Montis, A. Palmieri, A. Pisent, F. Scantamburlo
 
                       INFN/LNL, Legnaro (PD), Italy 
                - T. Akagi, K. Kondo, K. Sakamoto, T. Shinya, M. Sugimoto
 
                       QST, Aomori, Japan 
                - P. Cara
 
                       IFMIF/EVEDA, Rokkasho, Japan 
                - H. Dzitko, I.M. Moya
 
                       F4E, Germany 
                - R. Heidinger, A. Marqueta
 
                       Fusion for Energy, Garching, Germany 
                - I. Podadera
 
                       CIEMAT, Madrid, Spain 
          | 
          | 
    
    
        |   | 
        
        The IFMIF/EVEDA RFQ is the longest and powerful operated. Therefore, it requires a careful characterization from several aspects: beam dynamics, RF, mechanics, installation and commissioning. Due to the very large power handling, the preliminary beam operation was decided to be performed with a low proton beam current at one half of the voltage needed for deuteron accelera-tion, i.e. from 8 mA to 30 mA at 2.5 MeV in pulsed mode, with respect to the nominal 130-mA deuteron beam at 5 MeV in CW. In this framework, it will be presented the characterization of the RFQ in terms of simulation and measurements.
         | 
          | 
    
    
    	  | DOI • | 
        reference for this paper 
              ※ https://doi.org/10.18429/JACoW-LINAC2018-THPO062
         | 
          | 
    
    
    	  | About • | 
        paper received ※ 12 September 2018       paper accepted ※ 20 September 2018        issue date ※ 18 January 2019 | 
          | 
    
    
    	  | Export • | 
        reference for this paper using 
              ※ BibTeX, 
              ※ LaTeX, 
              ※ Text/Word, 
              ※ RIS, 
              ※ EndNote (xml)
         | 
          | 
    
    
        |   |