Paper |
Title |
Page |
TH-12 |
Construction and Commissioning of the RFQ for the CERN Lead-Ion Facility
|
722 |
|
- G. Bezzon, A. Lombardi, G. Parisi, A. Pisent, M. Weiss
INFN/LNL, Legnaro (PD), Italy
- P. Bourquin, A.M. Lombardi, M. Vretenar
CERN, Geneva, Switzerland
|
|
TH-15 |
The Matching Line Between the RFQ and the IH Linac of the CERN Lead Ion Facility
|
731 |
|
- A. Facco, A. Lombardi, A. Pisent, M. Weiss
INFN/LNL, Legnaro (PD), Italy
- A.M. Lombardi, W. Pirkl, M. Vretenar
CERN, Geneva, Switzerland
|
|
TH-16 |
Performances of the LEBT of the CERN Lead Ion Linac
|
734 |
|
- A. Lombardi, A. Pisent, M. Weiss
INFN/LNL, Legnaro (PD), Italy
- K. Langbein, A.M. Lombardi, E. Tanke, H.H. Umstätter
CERN, Geneva, Switzerland
|
|
TH-17 |
Input and Output Beam Matching for a RFQ where a Couple of Electrodes are at Ground Potential
|
737 |
|
- M. Comunian, A. Pisent
INFN/LNL, Legnaro (PD), Italy
|
|
TH-29 |
Studies of a Superconducting RFQ for Legnaro
|
774 |
|
- G. Bisoffi, A. Lombardi, A. Pisent
INFN/LNL, Legnaro (PD), Italy
- V.A. Andreev
ITEP, Moscow, Russia
|
|