| Paper |
Title |
Page |
| MO-54 |
Re-formation of the PF 2.5-GeV Linac to 8 GeV
|
184 |
| |
- A. Enomoto, H. Hanaki, K.W. Kakihara, T. Kamitani, Y. Ogawa, S. Ohsawa, T. Oogoe, I. Sato, S. Yamaguchi, M. Yokota
KEK, Ibaraki, Japan
|
|
| MO-56 |
Design of the Beam Transport System of the KEK B-Factory Injector
|
190 |
| |
- T. Kamitani, A. Enomoto, Y. Ogawa, S. Ohsawa, I. Sato
KEK, Ibaraki, Japan
|
|
| MO-57 |
High-Intensity Single-Bunch Beam of the PF 2.5-GeV Linac
|
193 |
| |
- S. Ohsawa, J.-Y. Choi, A. Enomoto, T. Kamitani, Y. Ogawa, I. Sato, T. Suwada, S. Yamaguchi, M. Yokota
KEK, Ibaraki, Japan
|
|
| TU-59 |
Emittance Growth and Beam Loading in Intense Electron Beams
|
502 |
| |
- J.-Y. Choi, A. Enomoto, T. Kamitani, Y. Ogawa, S. Ohsawa, I. Sato
KEK, Ibaraki, Japan
|
|
| TU-73 |
Wake-Field Issues Concerning the KEK B-Factory Injector Linac
|
535 |
| |
- Y. Ogawa, A. Enomoto, T. Kamitani, S. Ohsawa, I. Sato
KEK, Ibaraki, Japan
|
|
| TH-51 |
Control System for a Bunch /Profile Monitor at the KEK e+e- Linac
|
819 |
| |
- K. Furukawa, A. Enomoto, T. Kamitani, Y. Ogawa, S. Ohsawa
KEK, Ibaraki, Japan
|
|
| TH-86 |
Emittance Measurement of a High-Current Single-Bunch Electron Beam at the Pre-Injector of the KEK 2.5-GeV Linac
|
911 |
| |
- T. Suwada, T. Kamitani, H. Kobayashi, S. Ohsawa, T. Urano, M. Yokota
KEK, Ibaraki, Japan
|
|