Paper |
Title |
Page |
MO3-45 |
Experiments Connected with Tuning of the Drift Tube Cavities Stabilized with Post Couplers
|
158 |
|
- Ju. Bylinsky, S. Esin, A. Feschenko, P. Ostroumov, S. Zharylkapov
INR, Moscow, USSR
|
|
TH3-53 |
The Disk and Washer Structure for Moscow Meson Factory Linac
|
657 |
|
- S. Esin, L. Kravchuk, V. Paramonov, G. Romanov
INR, Moscow, USSR
|
|
TH3-54 |
Injectors for High-Intensity Linear Accelerator of INR Moscow Meson Factory
|
660 |
|
- A. Anikeichik, A. Belov, O. Elsukov, S. Esin, O. Frolov, V. Kish, V. Klenov, O. Korolev, S. Kubalov, V. Kuzik, A. Vasushenko, V. Yakushev
INR, Moscow, USSR
|
|