|
The Spallation Neutron Source (SNS)
|
|
1
|
|
Marion M. White (ORNL)
|
|
|
|
|
|
|
Laser Beam-Profile Monitor Development at BNL for SNS
|
|
21
|
|
R. Connolly, P. Cameron, J. Cupolo, C. Dawson, A. Della Penna, D. Gassner, M. Grau, M. Kesselman, S. Peng, R. Sikora (BNL)
|
|
|
|
|
|
|
Design of a 120 MeV H- Linac for CERN High-Intensity Applications
|
|
73
|
|
M. Vretenar and F. Gerigk (CERN)
|
|
|
|
|
|
|
Design of a Chopper Line for the CERN SPL
|
|
76
|
|
A. Lombardi, F. Caspers, K. Hanke, A. Millich, A. Mostacci, M. Paoluzzi, M. Vretenar (CERN)
|
|
|
|
|
|
|
Performance of a High Intensity Polarized H- Source on the Brookhaven 200 MeV Linac
|
|
146
|
|
J. Alessi, O. Gould, V. LoDestro, D. Raparia, J. Ritter, A. N. Zelenski (BNL), V. Klenov, S. A. Kokhanovski, V. Zoubets (INR), M. Okamura (RIKEN)
|
|
|
|
|
|
|
Design of a 4.5 MeV RFQ for Protons / H- Ions
|
|
245
|
|
S. A. Pande, M. Prasad (CAT)
|
|
|
|
|
|
|
The SNS RFQ Commissioning
|
|
331
|
|
A. Ratti, J. Ayers, R. Digennaro, L. Doolittle, R. A. Gough, M. Hoff, R. Keller , R. Macgill, J. Staples, S. Virostek, R. Yourd (LBNL)
|
|
|
|
|
|
|
A Linac Afterburner to Supercharge the Fermilab Booster
|
|
343
|
|
C. Ankenbrandt, J. MacLachlan, M. Popovic (FNAL), R. P. Johnson (IIT)
|
|
|
|
|
|
|
Commissioning Plans for the SNS DTL and CCL
|
|
355
|
|
E. Tanke, S. Assadi, G. Dodson, M. Giannella, D. Jeon (SNS/ORNL), L. Kravchuk (INR/ORISE), M. Plum, R. Shafer, J. Stovall (LANL)
|
|
|
|
|
|
|
Mechanical and RF properties of the DTL for the JAERI/KEK joint project
|
|
361
|
|
F. Naito, M. Ikegami, T. Kato, E. Takasaki, K. Yoshino (KEK), T. Ito (JAERI), S. Fujie, Z. Kabeya, S. Kakizaki, T. Kawasumi (MHI)
|
|
|
|
|
|
|
The SNS Front End LLRF System
|
|
373
|
|
L. Doolittle, C. C. Lo, M. Monroy, A. Ratti (LBNL)
|
|
|
|
|
|
|
The New HERA H- RF Volume Source
|
|
424
|
|
Jens Peters (DESY)
|
|
|
|
|
|
|
High-power Test of the SDTL for the JAERI/KEK Joint Project
|
|
427
|
|
F. Naito, Y. Fukui, Z. Igarashi, T. Kato, M. Kawamura, C. Kubota, E. Takasaki, S. Yamaguchi, K. Yoshino (KEK), T. Ito (JAERI)
|
|
|
|
|
|
|
Results of the SNS Front End Commissioning at Berkeley Lab
|
|
511
|
|
J. W. Staples, R. Keller, J. J. Ayers, L. Doolittle, J. B. Greer, S. Lewis, C. Lionberger, M. Monroy, J. Pruyn, A. Ratti, D. Syversrud, R. Thomae(LBNL), A. Aleksandrov, T. Shea(ORNL)
|
|
|
|
|
|
|
The JAERI/KEK Joint Project and its Performance
|
|
566
|
|
F. Naito (KEK), JAERI/KEK Joint Project Team (JAERI/KEK)
|
|
|
|
|
|
|
An Multi-Mission 8 GeV Injector Linac as a Fermilab Booster Replacement
|
|
828
|
|
G. William Foster (FNAL)
|
|
|
|
|
|