|
MO408 (POSTER)
|
|
|
Operational Characteristics and Availability of Klystron-Modulator System for PLS 2-GeV Electron Linac
|
|
52
|
|
|
|
|
|
|
|
|
MO409 (POSTER)
|
|
|
A New Modulator Controller of the PLS Linac
|
|
55
|
|
|
|
|
|
|
|
|
MO410 (POSTER)
|
|
|
Current Status and R&D plan of PAL Test Linac
|
|
58
|
|
|
|
|
|
|
|
|
MO467 (POSTER)
|
|
|
Fabrication and Test of Pulsed 200-MW Electron Gun for High-Power Klystrons
|
|
198
|
|
|
|
|
|
|
|
|
TU480 (POSTER)
|
|
|
Performance of the PLS High Precision Magnet Power Supplies
|
|
505
|
|
|
|
|
|
|
|
|
TH407 (POSTER)
|
|
|
Status of the PLS 2-2.5 GeV Electron Linac
|
|
619
|
|
|
|
|
|
|
|
|
TH443 (POSTER)
|
|
|
Upgrade of the MPS control system for PLS Linac
|
|
697
|
|
|
|
|
|
|
|
|
TH475 (POSTER)
|
|
|
Reliability and Maintenance of PLS Linac Mechanical Systems
|
|
772
|
|
|
|
|
|
|
|