| Paper | Title | Page | 
    
        | WEXB05 | Beam Commissioning SPIRAL2 | 2540 | 
    
        |  | 
                A.K. Orduz, M. Di Giacomo, R. Ferdinand, B. Jacquot, O. Kamalou, J.-M. Lagniel, G. Normand, A. SavalleGANIL, Caen, France
D. UriotCEA-IRFU, Gif-sur-Yvette, France
 |  | 
    
        |  | The SPIRAL2 injector includes a 5 mA proton-deuteron ECR source, a 1 mA ECR heavy ion source (up to A/Q =3) and a CW 0.73 MeV/u RFQ. It has been successfully commissioned using a diagnostic-plate in parallel with the superconducting linac installation. The green light has been obtained for the LINAC commissioning in July of 2019, starting with the Medium Energy Beam Transport (MEBT) commissioning with protons then with helium in 2020. The MEBT line and tuning process are described. The main experimental results are given, including the emittance and profile measurements which are compared with TraceWin simulations. RFQ output energy variation has been found due to an input energy error, its correction optimizing the source platform voltage is presented. |  | 
    
    	  | DOI • | reference for this paper 
              ※ https://doi.org/10.18429/JACoW-IPAC2021-WEXB05 |  | 
    
    	  | About • | paper received ※ 19 May 2021       paper accepted ※ 25 June 2021        issue date ※ 13 August 2021 |  | 
    
    	  | Export • | reference for this paper using 
              ※ BibTeX, 
              ※ LaTeX, 
              ※ Text/Word, 
              ※ RIS, 
              ※ EndNote (xml) |  | 
    
        |  |