Paper |
Title |
Page |
TUPRB031 |
FERMI Configuration for the Echo Enabled Harmonic Generation Experiment |
1752 |
|
- E. Allaria, D. Castronovo, M. Cautero, I. Cudin, M.B. Danailov, B. Diviacco, L. Giannessi, M. Veronese, M. Zangrando
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
|
|
|
The FERMI FEL-2 undulator line, normally operated in the double stage high gain harmonic generation with the fresh bunch (HGHG-FB) has been temporary modified to allow operating the FEL in the Echo Enabled Harmonic Generation (EEHG) scheme. An increase of the dispersion in the delay-line was required together with a replacement of the second stage modulator allowing the electron beam to resonantly interact with a second seed laser. Another critical component of the EEHG setup is a new manipulator installed in the delay-line chicane and hosting additional diagnostic components. In this work we describe in some detail these new components that allowed a successful demonstration of the EEHG at harmonics as high as 101.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPRB031
|
|
About • |
paper received ※ 17 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPRB021 |
Commissioning of S-band Cavity Test Facility at Elettra for Conditioning of High Gradient Structures for the Fermi Linac Upgrade |
2846 |
|
- N. Shafqat, L. Giannessi, C. Masciovecchio, M. Milloch, C. Serpico, M. Svandrlik, M. Trovò
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
- M. Bopp, R. Zennaro
PSI, Villigen PSI, Switzerland
- T.G. Lucas
The University of Melbourne, Melbourne, Victoria, Australia
|
|
|
FERMI is the seeded Free Electron Laser (FEL) user facility at Elettra laboratory in Trieste, operating in the VUV to soft X-rays spectral range. In order to extend the FEL spectral range to shorter wavelengths, a feasibility study for increasing the Linac energy from 1.5 GeV to 1.8 GeV is actually going on. A short prototype of a new High Gradient (HG) S-band accelerating structure has been built in collaboration with Paul Scherrer Institute (PSI). The new structures are intended to replace the present Backward Travelling Wave (BTW) sections and tailored to be operated at a gradient of 30 MV/m. For RF conditioning and high power testing of prototype, a Cavity Test Facility (CTF) is commissioned at FERMI. The test facility is equipped with RF pulse compressor system and a dedicated diagnostic for breakdown rate (BDR) measurements and events localization. In this paper we present in detail cavity test facility of FERMI and high power testing of the first prototype.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB021
|
|
About • |
paper received ※ 08 April 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|