JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for SUSPFO044: Multi-Ribbon Profile Monitor for High Power Proton Beam at J-PARC MR Abort Line

TY  - CONF
AU  - Sato, K.
AU  - Hamada, E.
AU  - Hashimoto, Y.
AU  - Igarashi, S.
AU  - Koseki, T.
AU  - Sato, Y.
ED  - Boland, Mark
ED  - Tanaka, Hitoshi
ED  - Button, David
ED  - Dowd, Rohan
ED  - Schaa, Volker RW
ED  - Tan, Eugene
TI  - Multi-Ribbon Profile Monitor for High Power Proton Beam at J-PARC MR Abort Line
J2  - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019
CY  - Melbourne, Australia
T2  - International Particle Accelerator Conference
T3  - 10
LA  - english
AB  - Japan Proton Accelerator Research Complex (J-PARC) Main Ring (MR), the world-class high intensity proton synchrotron, provides proton beam to two experimental facilities with two extraction modes: Fast extraction (FX) and Slow extraction (SX). The number of protons per pulse (ppp) in MR recorded the world highest value of 2.6×10¹⁴ in the FX mode. Now we are planning to increase the ppp further up to 3.3×10¹⁴ in near future. The beam profile is one of the most important parameters to discuss the high intensity beam dynamics in MR. Monitors using multi-wires / ribbons are effective to measure the beam profile with good accuracy and wide dynamic range. However, they cause significant beam losses by interactions with high-intensity circulating beam in synchrotrons. Recently, we installed new multi-ribbon profile monitor (MRPM) in an abort line in MR. The abort line is one of the extracted beam lines of the FX system. It has a quadrupole doublet which is called Abort Q and transports extracted beam to a beam dump. The FX system can extract the circulating beam in MR with an arbitrary energy. Performing the single-pass measurement with MRPM and changing the transfer matrix by sweeping field strength of Abort Q, the emittance of the extracted beam can be measured. In this paper, we present the design, manufacturing, and results of the first beam test of newly installed MRPM system.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 2561
EP  - 2563
DA  - 2019/06
PY  - 2019
SN  - 978-3-95450-208-0
DO  - DOI: 10.18429/JACoW-IPAC2019-WEPGW039
UR  - http://jacow.org/ipac2019/papers/wepgw039.pdf
ER  -