JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for MOPTS042: Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL

TY  - CONF
AU  - Bisoffi, G.
AU  - Andreev, V.
AU  - Bellan, L.
AU  - Bellato, M.A.
AU  - Bermudez, J.
AU  - Bissiato, E.
AU  - Bortolato, D.
AU  - Chiurlotto, F.
AU  - Comunian, M.
AU  - Contran, T.
AU  - Facco, A.
AU  - Fagotti, E.
AU  - Francescon, P.
AU  - Friso, A.
AU  - Galatà, A.
AU  - Gallo, C.S.
AU  - Giacchini, M.G.
AU  - Lollo, M.
AU  - Martini, D.
AU  - Miglioranza, M.O.
AU  - Modanese, P.
AU  - Montis, M.
AU  - Munaron, E.
AU  - Nigrelli, G.
AU  - Pavinato, S.
AU  - Pengo, M.
AU  - Pisent, A.
AU  - Poggi, M.
AU  - Pranovi, L.
AU  - Rossignoli, M.
AU  - Scarpa, D.
ED  - Boland, Mark
ED  - Tanaka, Hitoshi
ED  - Button, David
ED  - Dowd, Rohan
ED  - Schaa, Volker RW
ED  - Tan, Eugene
TI  - Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL
J2  - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019
CY  - Melbourne, Australia
T2  - International Particle Accelerator Conference
T3  - 10
LA  - english
AB  - During 2018, the PIAVE superconducting linac injector at INFN-LNL, based on superconducting RFQs and two cryomodules with quarter wave resonators, underwent a renovation plan. This operation was strictly related to the one carried out on ALPI [1], which will become a post-accelerator for both stable and exotic beams in a near future. PIAVE Quarter Wave Resonator (QWR) cryomod-ules, in operation since 2006, were moved to ALPI to be used for the acceleration of both stable beams and future exotic beams delivered from the cyclotron target-ion-source station, after appropriate purification, charge breeding and pre-acceleration stages. In order to cope with the removal of the two QWR cryomodules in PIAVE, a newly designed 80 MHz room temperature buncher was designed, built and tested: the buncher is required so as to match the longitudinal phase space between PIAVE su-perconducting RFQs (SRFQ1 and SRFQ2) and ALPI. In the same period, substantial refurbishments on the ECR ion source platform were carried out, in particular on its infrastructure and safety equipment. A problem on an electronic component on SRFQ2, though quickly fixed, delayed beam commissioning of the PIAVE injector, which will start at the end of May 2019.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 949
EP  - 952
KW  - rfq
KW  - SRF
KW  - operation
KW  - MMI
KW  - ion-source
DA  - 2019/06
PY  - 2019
SN  - 978-3-95450-208-0
DO  - DOI: 10.18429/JACoW-IPAC2019-MOPTS042
UR  - http://jacow.org/ipac2019/papers/mopts042.pdf
ER  -