The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
TY - CONF AU - Bisoffi, G. AU - Andreev, V. AU - Bellan, L. AU - Bellato, M.A. AU - Bermudez, J. AU - Bissiato, E. AU - Bortolato, D. AU - Chiurlotto, F. AU - Comunian, M. AU - Contran, T. AU - Facco, A. AU - Fagotti, E. AU - Francescon, P. AU - Friso, A. AU - Galatà, A. AU - Gallo, C.S. AU - Giacchini, M.G. AU - Lollo, M. AU - Martini, D. AU - Miglioranza, M.O. AU - Modanese, P. AU - Montis, M. AU - Munaron, E. AU - Nigrelli, G. AU - Pavinato, S. AU - Pengo, M. AU - Pisent, A. AU - Poggi, M. AU - Pranovi, L. AU - Rossignoli, M. AU - Scarpa, D. ED - Boland, Mark ED - Tanaka, Hitoshi ED - Button, David ED - Dowd, Rohan ED - Schaa, Volker RW ED - Tan, Eugene TI - Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL J2 - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019 CY - Melbourne, Australia T2 - International Particle Accelerator Conference T3 - 10 LA - english AB - During 2018, the PIAVE superconducting linac injector at INFN-LNL, based on superconducting RFQs and two cryomodules with quarter wave resonators, underwent a renovation plan. This operation was strictly related to the one carried out on ALPI [1], which will become a post-accelerator for both stable and exotic beams in a near future. PIAVE Quarter Wave Resonator (QWR) cryomod-ules, in operation since 2006, were moved to ALPI to be used for the acceleration of both stable beams and future exotic beams delivered from the cyclotron target-ion-source station, after appropriate purification, charge breeding and pre-acceleration stages. In order to cope with the removal of the two QWR cryomodules in PIAVE, a newly designed 80 MHz room temperature buncher was designed, built and tested: the buncher is required so as to match the longitudinal phase space between PIAVE su-perconducting RFQs (SRFQ1 and SRFQ2) and ALPI. In the same period, substantial refurbishments on the ECR ion source platform were carried out, in particular on its infrastructure and safety equipment. A problem on an electronic component on SRFQ2, though quickly fixed, delayed beam commissioning of the PIAVE injector, which will start at the end of May 2019. PB - JACoW Publishing CP - Geneva, Switzerland SP - 949 EP - 952 KW - rfq KW - SRF KW - operation KW - MMI KW - ion-source DA - 2019/06 PY - 2019 SN - 978-3-95450-208-0 DO - DOI: 10.18429/JACoW-IPAC2019-MOPTS042 UR - http://jacow.org/ipac2019/papers/mopts042.pdf ER -