JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for MOPGW084: Beam Loading Compensation for the Future Circular Hadron-Hadron Collider (FCC-hh)

TY  - CONF
AU  - Karpov, I.
AU  - Baudrenghien, P.
ED  - Boland, Mark
ED  - Tanaka, Hitoshi
ED  - Button, David
ED  - Dowd, Rohan
ED  - Schaa, Volker RW
ED  - Tan, Eugene
TI  - Beam Loading Compensation for the Future Circular Hadron-Hadron Collider (FCC-hh)
J2  - Proc. of IPAC2019, Melbourne, Australia, 19-24 May 2019
CY  - Melbourne, Australia
T2  - International Particle Accelerator Conference
T3  - 10
LA  - english
AB  - The power consumption of the rf system can be minimised by optimising the cavity detuning and the loaded quality factor. In high-current accelerators, the presence of gaps in the filling results in a modulation of the cavity voltage along the ring (transient beam loading) and as a consequence a spread in the bunch parameters. In addition longitudinal coupled-bunch instabilities can appear, caused by the cavity impedance at the fundamental. Both issues can be mitigated by using an rf feedback around the amplifier and cavity, a technique used in many high intensity machines including the Large Hadron Collider (LHC). Compared to the LHC machine, the energy increase and the radiation loss for the Future Circular hadron-hadron Collider (FCC-hh) will be larger, resulting in a synchronous phase deviating significantly from 180 degrees. The solutions adopted for the LHC must therefore be revisited. This paper evaluates several beam loading compensation schemes for this machine.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 301
EP  - 304
KW  - cavity
KW  - beam-loading
KW  - hadron
KW  - collider
KW  - impedance
DA  - 2019/06
PY  - 2019
SN  - 978-3-95450-208-0
DO  - DOI: 10.18429/JACoW-IPAC2019-MOPGW084
UR  - http://jacow.org/ipac2019/papers/mopgw084.pdf
ER  -