RIS citation export for TUPAL037: Installation Progress on FRIB β=0.041 Cryomodules Toward Beam Commissioning

TY - CONF
AU - Ao, H.
AU - Bird, B.
AU - Bultman, N.K.
AU - Casagrande, F.
AU - Compton, C.
AU - Davidson, K.D.
AU - Elliott, K.
AU - Facco, A.
AU - Ganni, V.
AU - Ganshyn, A.
AU - Gibson, P.E.
AU - Grender, I.
AU - Hartung, W.
AU - Hodges, L.
AU - Holland, K.
AU - Hussain, A.
AU - Ikegami, M.
AU - Jones, S.
AU - Knudsen, P.
AU - Laxdal, R.E.
AU - Lidia, S.M.
AU - Malloch, I.M.
AU - Metzgar, E.S.
AU - Miller, S.J.
AU - Morris, D.G.
AU - Ostroumov, P.N.
AU - Popielarski, J.T.
AU - Popielarski, L.
AU - Reaume, M.A.
AU - Russo, T.
AU - Saito, K.
AU - Shuptar, M.
AU - Stanley, S.
AU - Stark, S.
AU - Victory, D.R.
AU - Wei, J.
AU - Wenstrom, J.D.
AU - Wiseman, M.
AU - Xu, M.
AU - Xu, T.
AU - Xu, Y.
AU - Yamazaki, Y.
AU - Zhao, Q.
AU - Zhao, S.
ED - Koscielniak, Shane
ED - Satogata, Todd
ED - Schaa, Volker RW
ED - Thomson, Jana
TI - Installation Progress on FRIB β=0.041 Cryomodules Toward Beam Commissioning
J2 - Proc. of IPAC2018, Vancouver, BC, Canada, April 29-May 4, 2018
C1 - Vancouver, BC, Canada
T2 - International Particle Accelerator Conference
T3 - 9
LA - english
AB - The Facility for Rare Isotope Beams (FRIB) driver linac is to accelerate all the stable ion beams from proton to uranium beyond 200 MeV/u with beam powers up to 400 kW, which will be the first large-scale, CW SRF ion linac. The beam commissioning of the front end (from the ion source to the RFQ) already began and is in progress. The Accelerator Readiness Review (ARR) for beam through the first three β=0.041 cryomodules is scheduled for May 2018. The next step is the beam commissioning through the 12 SRF cavities housed in these 3 cryomodules with 6 superconducting solenoid magnets. The cryomodules and the adjacent warm diagnostics boxes in between have been already installed and aligned in the tunnel. This paper describes the installation progress of the β=0.041 cryomodules and plans for ARR02.
PB - JACoW Publishing
CP - Geneva, Switzerland
SP - 1087
EP - 1089
KW - MMI
KW - cryomodule
KW - diagnostics
KW - linac
KW - cryogenics
DA - 2018/06
PY - 2018
SN - 978-3-95450-184-7
DO - 10.18429/JACoW-IPAC2018-TUPAL037
UR - http://jacow.org/ipac2018/papers/tupal037.pdf
ER -