JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for TUPAF012: Commissioning of the Lipac Medium Energy Beam Transport Line

TY - CONF
AU - Podadera, I.
AU - Cara, P.
AU - Castellanos, J.
AU - Ebisawa, T.
AU - García, J.M.
AU - Gavela, D.
AU - Gex, D.
AU - Hirata, Y.
AU - Ibarra, A.
AU - Ihara, A.
AU - Ikeda, Y.
AU - Jiménez-Rey, D.
AU - Jokinen, A.
AU - Kasugai, A.
AU - Kitano, T.
AU - Knaster, J.
AU - Kondo, K.
AU - Marqueta, A.
AU - Martinez Fresno, L.M.
AU - Mendez Macias, M.
AU - Molina Marinas, E.
AU - Mollá, J.
AU - Moya, I.
AU - Méndez, P.
AU - Narita, T.
AU - Nomen, O.
AU - Oliver, C.
AU - Pruneri, G.
AU - Regidor, D.
AU - Sakamoto, K.
AU - Scantamburlo, F.
AU - Shinya, T.
AU - Sugimoto, M.
AU - Toral, F.
AU - Varela, R.
AU - Villamayor, V.
AU - Weber, M.
AU - de la Morena, C.
ED - Koscielniak, Shane
ED - Satogata, Todd
ED - Schaa, Volker RW
ED - Thomson, Jana
TI - Commissioning of the Lipac Medium Energy Beam Transport Line
J2 - Proc. of IPAC2018, Vancouver, BC, Canada, April 29-May 4, 2018
C1 - Vancouver, BC, Canada
T2 - International Particle Accelerator Conference
T3 - 9
LA - english
AB - LIPAc* will be a 9 MeV, 125 mA CW deuteron accelerator which aims to validate the technology to be used as neutron source of the IFMIF facility. Those facilities are essential for future fusion reactors material research. A 175 MHz RFQ will increase the energy up to 5 MeV before a Superconducting RF (SRF) linac with eight 175 MHz Half Wave Resonators brings the particles up to the final energy of 9 MeV. Between both stages, a Medium Energy Beam Transport line (MEBT)** aims at transporting and matching the beam between the RFQ and the SRF linac. The transverse focusing of the beam is controlled by five quadrupole magnets with integrated steerers, grouped in one triplet and one doublet. Two buncher cavities handle the longitudinal dynamics. Two movable scraper systems are included to purify the beam optics coming out the RFQ and avoid losses in the SRF linac. In this contribution, checkout of the beamline and its ancillaries in Japan is reported. Tests carried out on the beamline prior to the MEBT beam commissioning are described, focusing in vacuum tests, magnets powering, buncher conditioning and scrapers movement.
PB - JACoW Publishing
CP - Geneva, Switzerland
SP - 683
EP - 686
KW - cavity
KW - vacuum
KW - rfq
KW - controls
KW - operation
DA - 2018/06
PY - 2018
SN - 978-3-95450-184-7
DO - 10.18429/JACoW-IPAC2018-TUPAF012
UR - http://jacow.org/ipac2018/papers/tupaf012.pdf
ER -